Old Cod.Q00A00142
OWNER'S MANUAL OF THE MULCH CULTIVATOR PF-PD
New Cod. MANT2010/00493 R.1
MAINTENANCE
- 34
Copyright ©2009 della Alpego spa® - All rights are reserved. Reprinting or unauthorized use of this manual is strictly forbidden without written permission by Alpego spa
8.4. CHECKS AND CONTROLS
During first 600 hours of work it is a good thing to check all nuts, since stress could sort out the structure. Control
the values that are reported in table.
After that repeat the control every 200 hours of work
8.8
[ Nm ]
10.9
[ Nm ]
12.9
[ Nm ]
1.25
25
37
44
13
M 8
1.00
27
40
47
1.50
50
73
86
17
M 10
1.25
53
78
91
1.75
86
127
148
19
M 12
1.25
95
139
163
2.00
137
201
235
22
M 14
1.50
150
220
257
2.00
214
314
369
24
M 16
1.50
229
336
393
2.50
306
435
509
27
M 18
1.50
345
491
575
2.50
432
615
719
30
M 20
1.50
482
687
804
2.50
502
843
987
32
M 22
1.50
654
932
1090
3.00
744
1080
1240
36
M 24
2.00
814
1160
1360
Figure 8-3. Screws tightening torque (Nm)