5.

 

Turn the RESET Key Switch and the temperature controllers will indicate the actual platen temperature and 
the set point temperature. The platens cannot be switched on until the MAIN BREAKER is switched fully 
OFF and then ON.  The system is set to trip at or below 

30 ma

 of current leakage in under 

50 ms.

 

6. 

OPERATION 

6.1. 

How to Operate and Understand the Safety Features 

When power is connected to the panel L1, L2, L3 pilot lights will illuminate. The box will need to be reset 
using the keyed reset switch. Once reset 

a qualified person should take possession of the

 key so the control box 

cannot be randomly reset in the case of an earthing failure.  If a failure occurs only qualified personnel can 
examine repair or diagnose and reset the control box. The MAIN BREAKER can then be reset. The earth 
condition indicators will illuminate and show one of three colours.  

Switch the MAIN BREAKER fully OFF (0 or green) with some force and then back ON (1 or red) to reset. 
There are 2 indicator lights, one for the platens and one for the pump.  If either indicator shows Red there is a 
ground wire short.  This means a wire has crossed and is giving a false earth signal.  The earth connection is not 
confirmed as proper.   If either indicator shows Yellow, a cable or ground wire may be disconnected or 
registering too high a resistance to be sensed properly.  This could occur if the pump or platen cable is not 
plugged in or if an earth wire is not attached or corroded.  If the cables are plugged in and this Yellow indicator 
is showing shut down the press and inspect immediately.  If a Yellow or Red indication is on the affected plugs 
will have power removed immediately by the safety circuits of the T4P-GF box.  Power will not be supplied to 
the plugs until a Green indicator light is associated with the plug, or plugs.  If either indicator shows Green the 
system is ready to go.  If a pump is not used the pump indicator will show Yellow or no earth/ground attached. 

On the face is a Red push button.  This is used to test the earth fault system by producing a 

30ma

 signal to 

ground.   This should trip the earth fault system and turn the main breaker off.  Once tripped the push button 
will light up Red to indicate an earth fault problem and the power will be removed in under 

55ms

.  If the earth 

fault system does not trip, LOCK this box out and have it repaired immediately. This should be checked every 
time the T4P-GF system is used.  If the system has been tripped on its own and the main breaker is turned off 
and/or the push button is illuminated Red, an earth fault condition has occurred.  Stop use immediately and have 
a qualified person check the problem. 

The 

T4PGF1

 temperature control panel has two solid state temperature controllers, one for the top platen and 

one for the bottom platen. If one platen cable becomes disconnected, both platens and temperature indicators 
will switch OFF. The MAIN BREAKER will remain ON. 

The 

T4PGF1

 also has a single auxiliary receptacle for operating an HPP20-4 GF pressure pump.  The 

connections and coding block will be designed to accept only the voltage the GF box has been built to.  The 
receptacle is designed to have no power supplied to it unless a properly grounded HPP20-4 GF pump has been 
installed and the ground continuity check shows the pump system is functioning properly by indicating a Green 
light. 

Each temperature controller displays the process value (PV) which is the actual platen temperature, and the set 
value (SV) which is the desired temperature.  As the platens are heating and coming up to temperature the 
controllers will indicate this by running with a Green colour display. As the platen temperatures come close to 
the set point they will change to an Amber colour to signify that attention should be paid to the temperatures.  If 
the platen temperature set point is exceeded the controllers will show a Red display colour and sound a 90 dB 
alarm to signify a problem. Correct the problem immediately before damage occurs to the belt splice, or 
equipment.    

IMPORTANT: The platens must be ground fault ready as identified by an AS/GF in the model type (e.g. SVP-
AS/GF or RAB4-AS/GF) or the T4PGF1 control panel will not function. Most Almex vulcanizer platens can be 
easily converted to work with the T4PGF1 control panels. Contact Shaw-Almex Service for information. 

The control system is factory set to trip in the case of an earth fault failure below 

30ma

 at or less than 

55ms.

  If 

resistance to the earth increases to an unsafe level, the system is designed not to allow power to the platens and 
or pump.  Each circuit is fused or thermally protected to the appropriate load capability of the parts. “Do not 
replace with larger fuses”.  The main breaker is rated at 30 amps.  The pump is protected at 10 amps.  Platen 
plugs are protected at 15 amps each. 

 

Содержание T4PGF1

Страница 1: ...This manual was prepared to present the correct methods and procedures of operating and maintaining your ALMEX GROUND FAULT CONTINUITY CHECKING TEMPERATURE CONTROLPANEL Read this manual carefully bef...

Страница 2: ...l Heating 10 6 2 Temperature Control 10 7 REQUIRED DAILY TESTING 11 7 1 Required Daily Testing Before Use 11 8 MAINTENANCE 12 8 1 Opening the Control Cabinet 12 8 2 Overload Protection 12 8 3 Temperat...

Страница 3: ...Overcurrent Protection Required 30 Amp 15 per platen 10 amp pump Temperature Sensor 100 platinum RTD Index of Protection with case closed IP 67 Design of Protection with case open IP 66 Ancillary Item...

Страница 4: ...ply with the following in part or full where relevant AS NZS 3000 2007 Electrical Installations Australian New Zealand Wiring Rules AS NZS 3007 2013 Electrical equipment in mines and quarries Surface...

Страница 5: ...ould perform all maintenance of the electrical components of the temperature control panel 2 All of the electrical components contain live circuits Do not open or service any of the electrical equipme...

Страница 6: ...er Supply Connector 1REC 2 Main Breaker 1CB 3 Platen Switch x2 24 30SS 4 Platen Temperature Control x2 18 25TC 5 Platen Connector x2 5 11REC 6 Alarm over temperature audible 73ABU 7 Emergency Stop Swi...

Страница 7: ...Turn the top and bottom platen switches to the 0 off position 1 Install a suitable electrical connector to the power supply cable Refer to the electrical specifications indicated on the serial plate...

Страница 8: ...under 55ms If the earth fault system does not trip LOCK this box out and have it repaired immediately This should be checked every time the T4P GF system is used If the system has been tripped on its...

Страница 9: ...t 2 After changing the SET VALUE Turn the RESET Switch to off then back on Failure to do this may cause the temperature to overshoot the set point Important The maximum recommended operating temperatu...

Страница 10: ...emitting diode will continue to flash on and off to maintain SET VALUE temperature Start timing the cure when SET VALUE is reached 7 After the cure time turn the controller switches to the 0 off posi...

Страница 11: ...ny of the cables are not safe to use contact your maintenance department and or Shaw Almex for repair or replacement instructions 5 Check the cable plugs and receptacles for signs of wear or condition...

Страница 12: ...mediately VOIDS warranty SAFETY Disconnect The Power Supply 1 Remove the 8 screws around the perimeter of the face panel and carefully lift the chassis out of the case The chassis fits very closely in...

Страница 13: ...AT diode will flash until auto tuning is complete After set point has been reached it may take approximately 20 minutes for the AT diode to stop flashing It is necessary to wait for the AT diode to st...

Страница 14: ...nnection in cable or platen connector 1 This usually means an RTD probe is an incorrect type has failed or the signal is not getting to the temperature controller 2 This shows earth fault condition ha...

Страница 15: ...instruction manual 3 Faulty relay 3 Disconnect power supply and open control cabinet Using an Ohmmeter check for continuity between terminals L and T on the suspect relay If there is continuity relay...

Страница 16: ...ues Wed Thur Fri Sat Sun Complete system functionality check see Daily Prestart Inspections Sec 8 Electrical cable and cords are in good working order and not damaged Receptacle and locking clamp cond...

Страница 17: ...Daily Testing Sec 8 X X X X Electrical cable and cords are in good working order and free of damage and visibly labeled check continuity of the cables X X X X Receptacle and Locking Clamp Condition I...

Страница 18: ...work loads and conditions Contact Almex for instructions X X Check for proper temperature controller readings Contact Almex for instructions or have The Technician check during inspection X X Check fo...

Страница 19: ...T4PGF1 INSTRUCTION MANUAL Page 19 SHAW ALMEX INDUSTRIES LIMITED June 14 2017 12 RECEPTACLE PIN EXPLANATION Platen receptacle Pump Receptacle Ground Pin Pilot Pin Power Pins Voltage Coding Pin...

Страница 20: ...zation and documentation prior to returning goods to the factory The service department may be reached at the above numbers 12 3 Guarantee Your ALMEX vulcanizing equipment is guaranteed against defect...

Страница 21: ...T4PGF1 INSTRUCTION MANUAL Page 21 SHAW ALMEX INDUSTRIES LIMITED June 14 2017 14 WARRANTY...

Страница 22: ...960 008 Triple Fuse Holder 9FU 3 26900 026 Step Down Transformer Fuses STER 13 26728 021 Small Terminal 1 26728 025 Rail 3 1 32 Long 38340 GTER 6 26728 048 Ground Terminal TER 3 26728 040 Small Termin...

Страница 23: ...Component Part Information ITEM QTY PART NO DESCRIPTION 1REC 1 26766 014 Male Inlet Plug 1 CB 1 26920 034 Breaker 1 CB 1 R6545 Aluminum Breaker Plate 1 CB 1 26373 022 Breaker Seal Cover 1 CB 2 28600 0...

Страница 24: ...018 Base Pump 1 Lever 39REC 1 26772 026 Female Insert Crimp PL79 80 1 29301 016 Tri Colour Pilot Light 47PB 1 46600 026 Red Push Button Switch 47PB 1 29307 006 Base Red Light Module 47PB 1 26500 026...

Страница 25: ...T4PGF1 INSTRUCTION MANUAL Page 25 SHAW ALMEX INDUSTRIES LIMITED June 14 2017 16 ELECTRICAL DRAWINGS...

Страница 26: ...T4PGF1 INSTRUCTION MANUAL Page 26 SHAW ALMEX INDUSTRIES LIMITED June 14 2017...

Страница 27: ...T4PGF1 INSTRUCTION MANUAL Page 27 SHAW ALMEX INDUSTRIES LIMITED June 14 2017...

Страница 28: ...T4PGF1 INSTRUCTION MANUAL Page 28 SHAW ALMEX INDUSTRIES LIMITED June 14 2017...

Страница 29: ...T4PGF1 INSTRUCTION MANUAL Page 29 SHAW ALMEX INDUSTRIES LIMITED June 14 2017 TEST PLUG SCHEMATICS Part 46047 004...

Страница 30: ...T4PGF1 INSTRUCTION MANUAL Page 30 SHAW ALMEX INDUSTRIES LIMITED June 14 2017...

Отзывы: