KEENAN
MechFiber350 and 370 Operator’s Manual
26
Revision D01 21
st
May 2019
Model
MechFiber350 and 370
Primary drive chain
ASA 120
Links
104 (inc. joiner)
Pitch (mm)
38.1
Pitch (inches)
1.5
Chain length (mm)
3,962
Chain length (inches)
156
Rotor drive chain
ASA 160HS
Links
119 (inc. joiner)
Pitch (mm)
50.8
Pitch (inches)
2
Chain length (mm)
6,045
Chain length (inches)
238
Table 4: KEENAN MechFiber 350 and 370 drive chains
8.3 Greasing
1. Bearings
Each week, apply grease to the eight bearings with grease fittings. The bearings are as
follows:
a. The main rotor bearing at the front of the KEENAN MechFiber (A, Figure 12).
b. Two main bearings on the front and rear of the input drive shaft (B and C, Figure 12).
c. The auger bearing at the front of the KEENAN MechFiber (D, Figure 12)
d. The two main bearings at the rear of the KEENAN MechFiber (G and H, Figure 13).
2. Grease fittings
Each week, apply grease to the following points with grease fittings (there are up to 25).
The points include:
a. 2 pins and 2 bushes on the guillotine door lifting rams (I, J, K and L, Figure 14)
b. 18 grease fittings on the tandem axle assembly (where fitted):
2 on each brake rod, 1 on each pivot (8 in total)
1 on each brake arm (4 in total)
1 on each front spring pin (4 in total)
1 on each centre spring assembly pivot (2 in total)
c. 2 grease fittings, 1 on the secondary chain tension arm and 1 on the primary chain
tension arm (see Figure 15)
d. See Section 6.4 for bale handler maintenance details
e. Grease fitting in pivot bush on gearbox pin
3. VFC-door
Check that the VFC-door is able to move freely each day, and grease as appropriate.
4. PTO drive shaft
Refer to PTO operator
’s manual for greasing instructions and recommendations.
Содержание Keenan MechFiber350
Страница 2: ...KEENAN MechFiber350 and 370 Operator s Manual 2 Revision D01 21st May 2019...
Страница 36: ...KEENAN MechFiber350 and 370 Operator s Manual 36 Revision D01 21st May 2019 PART II Spare Parts...
Страница 46: ...KEENAN MechFiber350 and 370 Operator s Manual 46 Revision D01 21st May 2019 11 7 Standard feed out tray parts...
Страница 49: ...KEENAN MechFiber350 and 370 Operator s Manual 49 Revision D01 21st May 2019...
Страница 69: ...KEENAN MechFiber350 and 370 Operator s Manual 69 Revision D01 21st May 2019...