Allora Positive Contact PCS-250 Скачать руководство пользователя страница 8

Page 7

PCS-250 System

Trouble Shooting Guide

Please refer to the section that best describes the problem you are having.  
Determine if you can answer YES to all of the questions.  If not, attempt to correct 
the condition.  If at anytime you have questions, please contact our service 
department at 1-855-TOOL-911 (855-866-5911).

SYSTEM FAULT

(Red and green lights are illuminated simultaneously.)

Has a time been selected on the TCU-250?

Is the PCS-250 connected properly?

Color coded wires of cable should be attached to the correct terminals on the TCU-250

Cable should be screwed tight to the PCS-250

The inside of the PCS-250 connector should be dry

Manually move the sensing needle away from the start position.  Does the sensing needle return to the start 
position on its own?

Is there approximately 4.1VDC across the blue and black terminals on the TCU-250?  (The PCS-250 must 
remain connected to the TCU-250 for this measurement.)

Is there 24VDC across the Power terminals on the TCU-250?

If not, see 

No Power

to TCU-250

TCU-250 WILL NOT START

(Lights remain steady, PCS-250 does not swing and TCU-250 gives no output 

when a start signal is applied.)

Is the start signal being applied to the correct terminals?

Terminals 15 & 16 are for a 24VDC start signal.

Terminals 14 & 16 are for a 115VAC start signal.

Is the correct start signal being applied?

The signal can be AC or DC voltage.  Polarity does not matter.

The TCU-250 can be started with a 

low, high, low

sequence or 

a high, low, high

sequence.  The 

TCU-250 will always start on the transition from 

low

to 

high

.

Is the 

high

condition either 24V or 115V?

Is the 

low

condition 0 V?

The 

low

condition 

must be 0 V

.  If the 

low

condition is not an absolute 0 V, the TCU-250 

may not recognize it.

Is each change in condition being held for at least 100ms?

In an environment with a lot of electrical noise, (ie: large motors or motor starters), the 

high, low, 

high

sequence will block any noise from accidentally starting the TCU-250.

Is the start signal being applied 

after

the TCU-250 has completely finished its last cycle?

NO OUTPUT FROM TCU-250

Does the PCS-250 swing when the TCU-250 is given a start signal?

If not, see 

TCU-250 Will Not Start

Is the red or green light illuminated, and at its normal intensity?

If not, see 

No Power to TCU-250

The outputs  from the TCU-250 are momentary (500 ms.). Can your application use an output of this 
duration?

The outputs from the TCU-250 can be set to latch. (See Installation Instructions)

With tool present, give the TCU-250 a start signal. Do contacts 11 & 12 close (or open momentarily 
depending on face plate settings)? 

This same tool check can be done for the fault output by removing the tool and checking across 
contacts 9 & 10.

Содержание Positive Contact PCS-250

Страница 1: ...0 OK FAULT TEACH POWER 24VDC CW LO NT TIME FAULT OUTPUT OK OUTPUT COM 0 BLUE BLACK BROWN WHITE GRAY 1 2 3 4 6 5 4 3 2 1 CCW 1 2 3 HI NO NO NC NC M M L L TEACH RESET START 115V 24V ET USA Made in the P...

Страница 2: ...raight connector available upon request PCS 250 SENSOR 40MM 1 57 10MM 0 393 140MM 5 50 120MM 4 72 28MM 1 102 37 5MM 1 475 27MM 1 062 5 0M 16 0 TCU 250 OK FAULT POWER 24VDC CW LO NL TIME FAULT OUTPUT O...

Страница 3: ...ace available in the tooling area will determine the easiest mounting method and location With all machine power off hand hold the sensor in the tooling area to imagine its best placement Remember the...

Страница 4: ...to be repositioned while attached to the sensor rotate the entire sensor to avoid damage to the connector Make sure that the dip switch on the control unit is set to correspond to the CW or CCW direc...

Страница 5: ...application T 16 is the common for either a 115VAC start signal T 14 or a 24VDC start signal T 15 The TCU recognizes a change of state in the circuit to activate the checking sequence A minimum durat...

Страница 6: ...ount of time the sensor rotates during the scanning sequence Since it takes a greater amount of time to swing the sensing needle 180 than 90 a greater amount of time needs to be set If the sensor will...

Страница 7: ...d 115VAC machine control voltages For any questions or installation assistance contact 1 855 866 5911 TCU 250 OK FAULT TEACH POWER 24VDC CW LO NL TIME FAULT OUTPUT OK OUTPUT COM 0 BLUE BLACK BROWN WHI...

Страница 8: ...gnal Terminals 14 16 are for a 115VAC start signal Is the correct start signal being applied The signal can be AC or DC voltage Polarity does not matter The TCU 250 can be started with a low high low...

Страница 9: ...l The TCU 250 will run through one cycle the yellow light will turn off and the green light will illuminate The TCU 250 is now taught that tool s current position Is the tool within the PCS 250 s swin...

Страница 10: ...d mounting bracket for the Filter Regulator Gage is included with AP 1000 Kit Connect the provided NPT fitting into the filter regulator gage in the normal fashion Cut the tube to the required length...

Страница 11: ...ingle AP Sensors are supplied with an air tube and a NPT fitting for connection to the filter regulator Some machines may utilize more than one sensor One Allora AP 1000 Kit or customer supplied equiv...

Страница 12: ...ompliant materials They are free of Bromide Halogens PBB PBDE Mercury Cadmium and Chrome 6 All Positive Contact products are Lead Free All Positive Contact products comply with current EU environmenta...

Отзывы: