Allora Positive Contact PCS-250 Скачать руководство пользователя страница 5

TCU Terminal Descriptions

Terminals 1 & 2: The TCU operates with 24VDC, note that terminal 1 is + and terminal 2 
is - . This unit requires a minimum supply of 250 mA. When powering the TCU with an 
existing  24VDC power supply, confirm that the supply is capable of additional output 
capacity to power the TCU.

Terminal 3  . Is used as a remote Teach function.  The required input is + 24VDC for a 
minimum of 100mS. (OPTIONAL)

Terminals  4, 5, 6, 7 & 8: Sensor cable connection, as indicated. The preferred method 
is to connect the cable directly from the sensor to the TCU. If the TCU and sensor need 
to be connected via external junction box, avoid wiring near electromagnetic or high 
current devices.

DO NOT connect the braided shield in the supplied 
sensor cable to the machine ground !

Terminals 9 & 10: are dry contacts ( internal relay ) capable 
of switching 2A @ 250 VAC. The contact operation can be 
configured eliminating peripheral devices for interfacing 
the TCU  ( 

see Relay Control Switches , page 5)

Terminal 13: Is used to reset the TCU after a fault condition 
has been detected. The required input is + 24VDC for a 
minimum of 100mS. (OPTIONAL)

Terminals 14, 15 & 16 are used to activate the 
checking sequence when required in your application. 
T-16 is the common for either a 115VAC start signal  
(T-14 ) or a 24VDC start signal ( T-15 ). The TCU 
recognizes a change of state in the circuit to activate 
the checking sequence. A minimum duration of 
100mS is required regardless of the of the signal 
utilized, ( HI – LO – HI ) or ( LO – HI – LO ).

Certain solid state devices, although in their off ( LO ) state, may output a small amount 
of  current. Depending on the operating characteristics of these devices, the TCU may 
not recognize a change of state. If this condition occurs in your application you may 
need to incorporate an external relay to activate the checking sequence.

Terminals 11 & 12: are dry contacts ( internal relay ) capable 
of switching 2A @ 250 VAC. The contact operation can be 
configured eliminating peripheral devices for interfacing the 
TCU  ( 

see Relay Control Switches , page 5)

The start input can also be used as a RESET function. After the error condition has been 
corrected ( replace broken tool ) applying a start signal will cause the sensor to begin the 
scan sequence touching and confirming the tool has been replaced in-turn resetting the 
fault condition on the control unit.

TC

U

-2

50

OK

FAULT

TEACH

POWER

 24VDC

CW

LO
NT

TIME

  FAULT

OUTPUT

     OK

OUTPUT

CO

M (

0)

BL

U

E

BL

A

C

K

BR

OW

N

WHI

TE

GRA

Y

1

2

3

4

6

5

4

3

2

1

ON

C&
K S
D

A0

6

CCW

1
2
3

HI

ET

ON

C&K SDA04

NO

NO

NC

NC

M

M

L

L

+

-

TEA

C

H

R

ESET

START

115V 24V

16

15

14

13

12

11

10

9

1

2

3

4

5

7

8

6

Page 4

Содержание Positive Contact PCS-250

Страница 1: ...0 OK FAULT TEACH POWER 24VDC CW LO NT TIME FAULT OUTPUT OK OUTPUT COM 0 BLUE BLACK BROWN WHITE GRAY 1 2 3 4 6 5 4 3 2 1 CCW 1 2 3 HI NO NO NC NC M M L L TEACH RESET START 115V 24V ET USA Made in the P...

Страница 2: ...raight connector available upon request PCS 250 SENSOR 40MM 1 57 10MM 0 393 140MM 5 50 120MM 4 72 28MM 1 102 37 5MM 1 475 27MM 1 062 5 0M 16 0 TCU 250 OK FAULT POWER 24VDC CW LO NL TIME FAULT OUTPUT O...

Страница 3: ...ace available in the tooling area will determine the easiest mounting method and location With all machine power off hand hold the sensor in the tooling area to imagine its best placement Remember the...

Страница 4: ...to be repositioned while attached to the sensor rotate the entire sensor to avoid damage to the connector Make sure that the dip switch on the control unit is set to correspond to the CW or CCW direc...

Страница 5: ...application T 16 is the common for either a 115VAC start signal T 14 or a 24VDC start signal T 15 The TCU recognizes a change of state in the circuit to activate the checking sequence A minimum durat...

Страница 6: ...ount of time the sensor rotates during the scanning sequence Since it takes a greater amount of time to swing the sensing needle 180 than 90 a greater amount of time needs to be set If the sensor will...

Страница 7: ...d 115VAC machine control voltages For any questions or installation assistance contact 1 855 866 5911 TCU 250 OK FAULT TEACH POWER 24VDC CW LO NL TIME FAULT OUTPUT OK OUTPUT COM 0 BLUE BLACK BROWN WHI...

Страница 8: ...gnal Terminals 14 16 are for a 115VAC start signal Is the correct start signal being applied The signal can be AC or DC voltage Polarity does not matter The TCU 250 can be started with a low high low...

Страница 9: ...l The TCU 250 will run through one cycle the yellow light will turn off and the green light will illuminate The TCU 250 is now taught that tool s current position Is the tool within the PCS 250 s swin...

Страница 10: ...d mounting bracket for the Filter Regulator Gage is included with AP 1000 Kit Connect the provided NPT fitting into the filter regulator gage in the normal fashion Cut the tube to the required length...

Страница 11: ...ingle AP Sensors are supplied with an air tube and a NPT fitting for connection to the filter regulator Some machines may utilize more than one sensor One Allora AP 1000 Kit or customer supplied equiv...

Страница 12: ...ompliant materials They are free of Bromide Halogens PBB PBDE Mercury Cadmium and Chrome 6 All Positive Contact products are Lead Free All Positive Contact products comply with current EU environmenta...

Отзывы: