9
en
English
22
GG
HH
26. Install the fork terminal end of each yellow wire (
II
,
Figure 19a-b) on DC post 2 of 725 light relay 1 and 2.
Then, install the bare wire ends of the two black wires
into the open ports of the 3 port lever lock (
JJ
, Figure
19a-b) that was installed in Step 24.
23a
725 Relay 2
I I
725 Relay 1
I I
725 Relay
Connection Detail
23b
I I
725 Relay 2
725 Relay 1
JJ
27. Check and make sure all connections are secure and
tightened.
28. The wiring is now complete. Close the AC front panel,
reconnect the battery, start the engine and turn on the
lights to make sure all are operating correctly.
29.
Once the unit is verified to be operating correctly,
re-install the rear door panel.
JJ
Not for
Reproduction
Содержание Mine Spec
Страница 26: ...N o t f o r R e p r o d u c t i o n...
Страница 27: ...N o t f o r R e p r o d u c t i o n...
Страница 28: ...N o t f o r R e p r o d u c t i o n...