507404-02
Page 63 of 80
Issue 1448
Gas Valve Operation
1. STOP! Read the safety information at the beginning of
this section.
2. Set the thermostat to the lowest setting.
3. Turn
OFF
all electrical power to the unit.
4. This furnace is equipped with an ignition device which
automatically lights the burners. Do not try to light the
burners by hand.
5. Remove the upper access panel.
6. Move gas valve switch to
OFF. See Figure 66.
7. Wait five minutes to clear out any gas. If you then
smell gas, STOP! Immediately call your gas supplier
from a neighbor’s phone. Follow the gas supplier’s
instructions. If you do not smell gas go to next step.
8. Move gas valve switch to
ON. See Figure 66.
9. Replace the upper access panel.
10. Turn on all electrical power to the unit.
11. Set the thermostat to desired setting.
NOTE:
When unit is initially started, steps 1 through 11 may
need to be repeated to purge air from gas line.
12. If the appliance will not operate, follow the instructions
“Turning Off Gas to Unit” and call your service technician
or gas supplier.
Turning Off Gas to Unit
1. Set the thermostat to the lowest setting.
2. Turn off all electrical power to the unit if service is to be
performed.
3. Remove the upper access panel.
4. Move gas valve switch to
OFF.
5. Replace the upper access panel.
Failure To Operate
If the unit fails to operate, check the following:
1. Is the thermostat calling for heat?
2. Are access panels securely in place?
3. Is the main disconnect switch closed?
4. Is there a blown fuse or tripped breaker?
5. Is the filter dirty or plugged? Dirty or plugged filters will
cause the limit control to shut the unit off.
6. Is gas turned on at the meter?
7. Is the manual main shut–off valve open?
8. Is the internal manual shut–off valve open?
9. Is the unit ignition system in lockout? If the unit locks
out again, inspect the unit for blockages.
Heating Sequence Of Operation
1. When thermostat calls for heat, combustion air inducer
starts.
2. Combustion air pressure switch proves blower operation.
Switch is factory set and requires no adjustment.
3. After a 15 second prepurge, the hot surface ignitor
energizes.
4. After a 20 second ignitor warm-up period, the gas valve
solenoid opens.
5. Gas is ignited, flame sensor proves the flame, and the
combustion process continues.
6.
If flame is not detected after first ignition trial, the ignition
control will repeat steps 3 and 4 four more times before
locking out the gas valve. The ignition control will then
automatically repeat steps 1 through 6 after 60 minutes.
To interrupt the 60 minute period, move thermostat from
“Heat” to “OFF” then back to “Heat”. Heating sequence
then restarts at step 1.
Figure 66
Содержание A96US2V
Страница 3: ...507404 02 Page 3 of 80 Issue 1448 EXPANDED VIEW Figure 1 ...
Страница 31: ...507404 02 Page 31 of 80 Issue 1448 Figure 38 ...
Страница 38: ...507404 02 Page 38 of 80 Issue 1448 Figure 56 TRAP DRAIN ASSEMBLY USING 1 2 PVC or 3 4 PVC ...
Страница 41: ...507404 02 Page 41 of 80 Issue 1448 Table 9 ...
Страница 45: ...507404 02 Page 45 of 80 Issue 1448 ...
Страница 47: ...507404 02 Page 47 of 80 Issue 1448 Integrated Control Figure 56 ...
Страница 78: ...507404 02 Page 78 of 80 Issue 1448 Start Up Performance Check List UNIT SET UP ...
Страница 79: ...507404 02 Page 79 of 80 Issue 1448 UNIT OPERATION Heating Mode Cooling Mode ...