507335-01
Page 27 of 44
Issue 1624
In all instances, other than wiring for the thermostat, the
wiring to be done and any replacement of wire shall conform
with the temperature limitation for Type T wire –63°F (35°C)
rise.
Connect a sufficiently sized wire with ground to the furnace’s
line voltage connections and ground wire. Refer to the
furnace rating plate for electrical characteristics to be used
in sizing field supply wiring and overcurrent protection.
The line voltage supply should be routed through a readily
accessible disconnect located within sight of the furnace.
A junction box on the furnace side panel is provided for line
voltage connections. Refer to the furnace wiring diagram
for specific connection information.
Proper polarity of the supply connections (“HOT” and
“NEUTRAL”) must be observed to ensure that safety
controls provide the protection intended.
A connection to the unit’s ground wire and actual earth
ground (typically a ground stake or buried steel pipe) must
be maintained for proper operation.
Thermostat
Install a room thermostat according to the instructions
furnished with it. Select a location on an inside wall that is
not subject to drafts, direct sunshine, or other heat sources.
The initial heat anticipator setting should be equal to the total
current draw of the control circuit. Low voltage thermostat
connections are to be made to the integrated ignition/blower
control board as indicated on the wiring diagram.
Single Stage Thermostat Operation
(A80UH2V and 80G2UH-V Models )
The automatic heat staging option allows a single stage
thermostat to be used with two stage furnace models
(A80UH2V or 80G2UH-V). To activate this option, move the
jumper pin (see Figure 31) to desired setting (5 minutes or
10 minutes). The furnace will start on 1st stage heat and
stay at 1st stage heat for the duration of the selected time
before switching to 2nd stage heat.
W1 on the control board must be connected to W1 on the
thermostat.
Humidifier
Terminals are provided on the integrated ignition/blower
control board for connection to a 120-volt humidifier. The
“HUM” terminal is energized whenever the thermostat
calls for heat. See the furnace wiring diagram for specific
connection information.
Electronic Air Cleaner
Terminals are provided on the integrated ignition/blower
control board for connection of a 120-volt electronic air
cleaner. The “EAC” terminal is energized whenever the
thermostat calls for heat, cooling, or continuous blower. See
furnace wiring diagram for specific connection information.
Variable Speed Features
This furnace is equipped with a variable speed circulation
air blower motor that will deliver a constant airflow within a
wide range of external static pressures. Other features of
this variable speed motor include:
Soft Start
The variable speed motor will slowly ramp up to normal
operating speed. This minimizes noise and increases
comfort by eliminating the initial blasts of air encountered
with standard motors.
Soft Stop
At the end of a cooling or heating cycle, the variable speed
motor will slowly ramp down after a short blower “off” delay.
If continuous blower operation has been selected, the
variable speed motor will slowly ramp down until it reaches
the airflow for that mode.
Passive and Active Dehumidification
Passive Dehumidification
For situations where humidity control is a problem, a
dehumidification feature has been built into the variable
speed motor. At the start of each cooling cycle, the variable
speed motor will run at 82% of the rated airflow for 7.5
minutes. After 7.5 minutes has elapsed, the motor will
increase to 100% of the rated airflow.
Automatic Heat Staging Jumper
Figure 31
Содержание 80G2UH-V
Страница 29: ...507335 01 Page 29 of 44 Issue 1624 ADJUSTING AIRFLOW Table 11 ...
Страница 37: ...507335 01 Page 37 of 44 Issue 1624 Burner Combustion Air Inducer Assembly and Heat Exchanger Removal Figure 38 ...
Страница 41: ...507335 01 Page 41 of 44 Issue 1624 Wiring Diagram Figure 41 ...
Страница 42: ...507335 01 Page 42 of 44 Issue 1624 Typical Field Wiring Diagram Figure 42 ...
Страница 43: ...507335 01 Page 43 of 44 Issue 1624 Start Up Performance Check List UNIT SET UP ...
Страница 44: ...507335 01 Page 44 of 44 Issue 1624 UNIT OPERATION ...