Chapter 2: Installation
30
Unpacking the Switch
To unpack the switch, perform the following procedure:
1. Remove all of the components from the shipping package.
Note
Store the packaging material in a safe location. You must use the
original shipping material if you need to return the unit to Allied
Telesis.
2. Place the switch on a level, secure surface.
3. Verify that the shipping container includes the items listed in Figure 5
on page 30 in addition to your AT-GS950/8, AT-GS950/16, AT-GS950/
24 or AT-GS950/48 switch.
Figure 5. AT-GS950/xx Packing List
Two equipment rack or
wall brackets
Eight bracket screws
Four wall anchors
Four wall screws
Four rubber feet (for
desktop installation)
One regional AC power
cord
Two or four SFP slot dust
covers (pre-installed).
Содержание AT-GS950/16
Страница 6: ...Contents 6 Certifications 49 Connectors and Port Pinouts 50...
Страница 8: ...List of Figures 8...
Страница 10: ...List of Tables 10...
Страница 24: ...Chapter 1 Overview 24 Figure 4 Gigabit Ethernet Backbone Topology Legend 100 Mbps 1000 Mbps 10 Mbps...
Страница 42: ...Chapter 2 Installation 42...
Страница 46: ...Chapter 3 Troubleshooting 46...
Страница 52: ...Appendix A Technical Specifications 52...