AT-GS950/8, AT-GS950/16, AT-GS950/24 and AT-GS950/48 Switches Installation Guide
41
Powering On the Switch
To power on the switch, perform the following procedure:
1. Plug the power cord into the AC power connector on the back of the
switch, as shown in Figure 15.
Figure 15. Plugging in the AC Power Cord
2. Plug the other end of the power cord into a wall outlet.
Warning
Power cord is used as a disconnection device. To de-energize
equipment, disconnect the power cord.
E3
Note
Pluggable Equipment. The socket outlet shall be installed near the
equipment and shall be easily accessible.
E5
3. Verify that the POWER LED is green. If the LED is OFF, refer to
Chapter 3, “Troubleshooting” on page 43.
The switch is now powered on and ready for network operations. For
information on how to manage the switch, refer to the
AT-S107, AT-
S108, or AT-S109 Management Software User’s Guide
.
Содержание AT-GS950/16
Страница 6: ...Contents 6 Certifications 49 Connectors and Port Pinouts 50...
Страница 8: ...List of Figures 8...
Страница 10: ...List of Tables 10...
Страница 24: ...Chapter 1 Overview 24 Figure 4 Gigabit Ethernet Backbone Topology Legend 100 Mbps 1000 Mbps 10 Mbps...
Страница 42: ...Chapter 2 Installation 42...
Страница 46: ...Chapter 3 Troubleshooting 46...
Страница 52: ...Appendix A Technical Specifications 52...