GS950/PS Series Switches Installation Guide
63
Powering on the
AT-GS950/48PS
Switch
To power on the switch, perform the following procedure:
1. Plug the power cord into the AC power connector on the back of the
switch, as shown in Figure 38.
Figure 38. Plugging in the AC Power Cord
2. Plug the other end of the power cord into a wall outlet.
Warning
Power cord is used as a disconnection device. To de-energize
equipment, disconnect the power cord.
E3
Note
Pluggable Equipment. The socket outlet shall be installed near the
equipment and shall be easily accessible.
E5
3. Verify that the POWER LED is green. If the LED is OFF, see Chapter
Содержание AT-GS950/10PS
Страница 6: ...Contents 6...
Страница 8: ...List of Figures 8...
Страница 10: ...List of Tables 10...
Страница 14: ...14...
Страница 40: ...Chapter 1 Overview 40...
Страница 58: ...Chapter 2 Installation 58 6 Go to Cabling the Switch on page 59...
Страница 68: ...Chapter 3 Troubleshooting 68...