Chapter 2: Installation
60
Powering On the Switch
To power on the switch, perform one of the following procedures,
depending on your model:
For AT-GS950/10PS, AT-GS950/16PS, and AT-GS950/28PS
switches, refer to “Powering on the AT-GS950/10PS, AT-GS950/
16PS, and AT-GS950/28PS Switches”.
For the AT-GS950/48PS switch, refer to “Powering on the AT-GS950/
48PS Switch” on page 63.
Powering on the
AT-GS950/10PS,
AT-GS950/16PS,
and AT-GS950/
28PS Switches
To install the power cord retaining clip and power on the switch, perform
the following procedure:
1. To install the power cord retaining clip, position it with the “u” part
facing down, press in the sides, and insert the ends of the clip into the
holes in the retaining bracket on the AC connector. See Figure 34.
Figure 34. Installing the Retaining Clip
Содержание AT-GS950/10PS
Страница 6: ...Contents 6...
Страница 8: ...List of Figures 8...
Страница 10: ...List of Tables 10...
Страница 14: ...14...
Страница 40: ...Chapter 1 Overview 40...
Страница 58: ...Chapter 2 Installation 58 6 Go to Cabling the Switch on page 59...
Страница 68: ...Chapter 3 Troubleshooting 68...