506892-01
Page 34 of 64
Issue 1251
Ramping Option A (Factory Selection)
•
Motor runs at 50% for 30 seconds.
•
Motor then runs at 82% for approximately 7-1/2 minutes.
•
If demand has not been satisfied after 7-1/2 minutes,
motor runs at 100% until demand is satisfied.
•
Once demand is met, motor runs at 50% for 30 seconds
then ramps down to stop.
Ramping Option B
•
Motor runs at 82% for approximately 7-1/2 minutes. If
demand has not been satisfied after 7-1/2 minutes,
motor runs at 100% until demand is satisfied.
•
Once demand is met, motor ramps down to stop.
Ramping Option C
•
Motor runs at 100%
until
demand is satisfied.
•
Once demand is met, motor runs at 100% for 45
seconds then ramps down to stop.
Ramping Option D
•
Motor runs at 100% until demand is satisfied.
•
Once demand is met, motor ramps down to stop.
Switches 11, 12 and 13 — Heating Mode Blower Speed
The switches are factory set to the OFF position which
provides factory default heat speed. Refer to Table 18 for
switches 11, 12 and 13 that provided the corresponding
increases or decrease to both high and low heat demand.
Cooling Mode Blower Speed Ramping
Table 17
R am p in g O p tio n
S w
i
tch 9
S w itch 10
A
(
F ac tor
y)
O ff
O ff
B
O ff
O n
C
O n
O ff
D
O n
O n
H e
a
t S p e ed
S w itch
S w itch
S w itch
11
12
1
3
I
nc re
as
e 24
%
O n
O n
O n
In
c re
as
e 18
%
O
n
O n
O
f
f
I
n
c r
eas
e 12%
O
n
O ff
O n
Inc
r
e
a
s
e
6
%
O n
O ff
O ff
F
a
c t
o
ry D efault
O ff
O ff
O f
f
D
ec
r
eas e 6
%
O ff
O f
f
O n
D
ec re
a
s e 12
%
O ff
O n
O f
f
D
ec reas e
1
8
%
O ff
O
n
O n
Heating Mode Blower Speeds
Table 18
Содержание A80DS2V
Страница 3: ...506892 01 Page 3 of 64 Issue 1251 EXPANDED VIEW Figure 1...
Страница 24: ...506892 01 Page 24 of 64 Issue 1251 Figure 22...
Страница 25: ...506892 01 Page 25 of 64 Issue 1251 Figure 23 Optional Accessories for use with any Comfort SyncTM System...
Страница 28: ...506892 01 Page 28 of 64 Issue 1251 Table 13C Field Wiring Applications with Conventional Thermostat continued...
Страница 29: ...506892 01 Page 29 of 64 Issue 1251 Field Wiring Applications with Conventional Thermostat continued Table 13D...
Страница 30: ...506892 01 Page 30 of 64 Issue 1251 Figure 24 A80DS2V Schematic Wiring Diagram...
Страница 31: ...506892 01 Page 31 of 64 Issue 1251 Typical A80DS2V Field Wiring Diagram Figure 25...
Страница 32: ...506892 01 Page 32 of 64 Issue 1251 Integrated Control Figure 26...
Страница 50: ...506892 01 Page 50 of 64 Issue 1251 Integrated Control Diagnostic Codes...
Страница 51: ...506892 01 Page 51 of 64 Issue 1251 Integrated Control Diagnostic Codes continued...
Страница 52: ...506892 01 Page 52 of 64 Issue 1251 Integrated Control Diagnostic Codes continued...
Страница 53: ...506892 01 Page 53 of 64 Issue 1251 Integrated Control Diagnostic Codes continued...
Страница 54: ...506892 01 Page 54 of 64 Issue 1251 Integrated Control Diagnostic Codes continued...
Страница 55: ...506892 01 Page 55 of 64 Issue 1251 Program Unit Capacity Size Mode...
Страница 56: ...506892 01 Page 56 of 64 Issue 1251 Troubleshooting Heating Sequence of Operation...
Страница 57: ...506892 01 Page 57 of 64 Issue 1251 Troubleshooting Heat Sequence of Operation continued...
Страница 58: ...506892 01 Page 58 of 64 Issue 1251 Troubleshooting Heat Sequence of Operation continued...
Страница 59: ...506892 01 Page 59 of 64 Issue 1251 Troubleshooting Heat Sequence of Operation continued...
Страница 60: ...506892 01 Page 60 of 64 Issue 1251 Troubleshooting Continuous Fan Sequence of Operation...
Страница 61: ...506892 01 Page 61 of 64 Issue 1251 Start Up Performance Check List UNIT SET UP...
Страница 62: ...506892 01 Page 62 of 64 Issue 1251 Start Up Performance Check List continued...