Roof Curb Installation

If a roof curb is used, follow the manufacturer’s Installation
Instructions and be sure that all required clearances are
observed (see following Clearances section).

Clearances

All units require certain clearances for proper operation and
service.  Refer to Table 1 for the minimum clearances to
combustibles as well as minimum clearances necessary for
servicing and proper unit operation.

In the U.S., units may be installed on combustible floors made
from wood or class A, B, or C roof covering material.  In Canada,
units may be installed on combustible floors.

Service Access

Access to all serviceable components is provided by four
removable panels: filter compartment, blower compartment,
furnace compartment, and top panel.

Combustion Products Discharge

The unit must be positioned such that combustion products
discharged at the vent outlet will not result in building
degradation and must be consistent with the National Fuel
Gas Code, Z223.1 or CAN/CGA-B149.1 & .2.

The products of combustion are discharged through a
screened opening in the front mullion.  The horizontal vent
system shall terminate at least 4' below, 4' horizontally from,
or 1' above any door, window, or gravity air inlet into the
building.  The vent system shall terminate at least 3' above
any forced air inlet located within 10'.

The unit shall be installed in a manner such that snow
accumulation will not restrict the flow of flue products.

In addition to the above requirements, consideration must
be given to prevent unwanted ice buildup from the vent
condensate.  The vent should not be located on the side of
a building where the prevailing winter winds could trap the
moisture, causing it to freeze on the walls or on overhangs
(under eaves).  The vent location should not discharge over

Figure 3 shows the minimum clearances to combustibles
required above and below the vent hood.  The minimum
clearance in front of the vent hood is 24".

Do not permit overhanging structures or shrubs to
obstruct condenser air discharge outlet or vent outlet.

Minimum Clearance to Combustibles

Above and Below the Vent Hood

Figure 3

Minimum Clearance
Above Vent Hood:
Distance from Top
of Vent Hood to Top
of Unit

Minimum Clearance
Below Vent Hood:
Distance from Bottom
of Vent Hood to Base
of Unit

o

T

e

l

b

i

t

s

u

b

m

o

C

l

a

i

r

e

t

a

M

r

o

F

e

c

i

v

r

e

S

r

o

F

r

e

p

o

r

P

n

o

i

t

a

r

e

p

O

t

n

o

r

F

"

4

2

"

8

4

"

3

r

a

e

R

"

0

"

4

2

"

3

r

e

s

n

e

d

n

o

C

d

n

E

"

0

"

4

2

"

3

r

e

w

o

l

B

d

n

E

"

0

"

0

3

"

0

p

o

T

"

0

"

6

3

"

6

3

Minimum Clearance Requirements

Table 1

Roof Curb Assembly

Figure 2

Содержание 4PGE

Страница 1: ...it WARNING INSTALLATION AND MAINTENANCE INSTRUCTIONS 4PGE SG 13 15 Series Gas Heating Electric Cooling Package Unit Save these instructions for future reference The installation of the furnace wiring...

Страница 2: ...er charge and airflow may reduce energy efficiency and shorten equipment life Inspection As soon as the unit is received it should be inspected for possible damage during transit If damage is evident...

Страница 3: ...pers that will provide continuous heating is not allowed The return air duct must be provided and sealed to the unit Return air temperature must be maintained between 60 F 16 C and 80 F 27 C Air filte...

Страница 4: ...above any door window or gravity air inlet into the building The vent system shall terminate at least 3 above any forced air inlet located within 10 The unit shall be installed in a manner such that s...

Страница 5: ...nnected to the venting system being placed into operation while all other appliances connected to the common venting system are not in operation 1 Seal any unused openings in the common venting system...

Страница 6: ...pening Filters Air filters are to be used with this heating cooling unit Filters are not factory supplied in the unit However a filter frame accessory is available from the manufacturer that allows fi...

Страница 7: ...trap drip leg shall be installed as close as practical to the gas supply inlet of the unit LPG Propane Units Tanks and Piping Units are shipped equipped for natural gas but can be converted to LPG pro...

Страница 8: ...wiring must be sized to carry minimum circuit ampacity marked on the unit Use copper conductors only Each unit must be wired with a separate branch circuit and be properly fused Thermostat The room t...

Страница 9: ...Used WITHOUT ECONOMIZER L2 L1 POWER WIRING 208 230 1 60 75 C MIN WIRE POWER WIRING 24V CONTROL WIRING NEC CLASS 2 GROUND SCREW SINGLE PHASE L1 L2 L3 GROUND SCREW POWER WIRING 200 230 3 60 460 575 3 6...

Страница 10: ...hould the supply pressure during standby exceed 13 w c nor should it be less than 5 w c for For Your Safety Read Before Lighting natural gas or 11 W C for propane gas with the burners in operation If...

Страница 11: ...contained factory optimized refrigerant system and should require no adjustments when properly installed If however unit performance is questioned perform the following checks OPERATION The heating v...

Страница 12: ...t work for air leaks as well as restrictions and blower speed settings If unit performance remains questionable remove charge evacuate to 500 Microns and weigh in refrigerant to name plate charge It i...

Страница 13: ...loperateswhenahightemperature condition caused by inadequate airflow occurs This causes the ignition control to close the gas valve The circulation air blower continues to operate in this situation Pr...

Страница 14: ...low tipping of the natural gas burner flame or long yellow tips on propane may be caused by lint accumulation or dirt inside the burner or burner ports at the air inlet between the burner and manifold...

Страница 15: ...506488 01 Page 15 Issue 1008 Figure 11 Connection Diagram Single Phase PSC Motor...

Страница 16: ...N 75 C WIRE WARNING ELECTRIC SHOCK HAZARD UNIT MUST BE GROUNDED IN ACCORDANCE WITH NATIONAL AND LOCAL CODES HEAT ANTICIPATION SETTING 0 70 AMP LINE VOLTAGE FIELD INSTALLED SEE BLOWER SPEED CHART BLK S...

Отзывы: