background image

Page 12

506488-01

Issue 1008

in the 10-second interval, then the ignition control will
de-energize the gas valve.

4. The ignition control is designed to repeat this “trial for

ignition” a total of three times.  If, at the end of the third
trial, a flame still has not been established, the ignition
control will repeat the trial for ignition sequence 1 hour
later.  The 1-hour retry is indefinite.  The ignition control
can be reset by interrupting the unit power or the
thermostat circuit.

5. Thirty seconds (nominal) after the initial trial for ignition,

the circulation air blower will start.

6. When the thermostat is satisfied, the combustion blower

and gas valve are de-energized.  The circulating air
blower motor will continue to run for a short period after
the thermostat is satisfied.

Circulating Air Blower

Depending on the package unit model, the blower motor will
be either a multi-tap PSC motor or a variable speed motor.

PSC Motor

The circulating air blower is controlled by a timing circuit in the
integrated blower/ignition control.  Timings are not adjustable.

Cooling

 – Blower “on” delay is 5 seconds after call for

cooling.  Blower “off” delay is 90 seconds after the cooling
system shuts down.

Heating

 – Blower “on” delay is 30 seconds nominal after

burner ignition.  Blower "off" delay is approximately 120
seconds after the thermostat is satisfied.

Insure unit is installed per manufacturer’s instructions and
that line voltage and air flows are correct.  Refer to Table 3
for proper superheat or subcooling values.  Check superheat
settings by measuring pressure at the suction line service
port.  For TXV systems, measure pressure at the liquid
service port.  Take line temperature within 2 inches of service
port connection to its main tube.  If unit superheat/subcooling
varies by more than table allowance, check internal seals,
service panels and duct work for air leaks, as well as
restrictions and blower speed settings.  If unit performance
remains questionable, remove charge, evacuate to 500
Microns, and weigh in refrigerant to name plate charge.  It is
critical that the exact charge is re-installed.  Failure to comply
will compromise system performance.  If unit performance
is still questionable, check for refrigerant related problems
such as, blocked coil or circuits, malfunctioning metering
devices or other system components.

Heating System

With the proper thermostat and sub-base, continuous blower
operation is possible by closing the R to G circuit. Cooling
blower delay is also functional in this mode.

Heating Sequence of Operation

1. When the thermostat calls for heat, the combustion blower

is energized by the ignition control.

2. When the speed of the combustion blower reaches

proper RPM, the pressure switch closes, initiating the
pre-purge timing (30 seconds nominal).

3. When pre-purge has expired, the ignition control energizes

the gas valve, the spark electrode, and the flame sensor.
The igniter sparks for 10 seconds, and the flame sensor
senses that flame has been established.  If the flame
sensor does not sense that flame has been established

l

e

d

o

M

r

o

t

o

M

P

H

T

S

U

J

D

A

g

n

i

t

t

e

S

T

A

E

H

g

n

i

t

t

e

S

c

i

t

a

t

S

0

5

.

@

M

F

C

g

n

il

o

o

C

l

a

n

i

m

o

N

g

n

il

o

o

C

U

T

B

k

g

n

i

t

a

e

H

t

u

p

n

I

U

T

B

k

L

O

O

C

g

n

i

t

t

e

S

A

L

O

O

C

g

n

i

t

t

e

S

B

L

O

O

C

g

n

i

t

t

e

S

C

L

O

O

C

g

n

i

t

t

e

S

D

0

3

,

4

2

8

6

3

/

1

M

R

O

N

A

0

0

0

1

0

0

8

0

0

6

0

0

9

6

3

8

6

2

/

1

M

R

O

N

B

0

0

2

1

0

0

0

1

0

0

8

0

0

1

1

6

3

0

9

2

/

1

M

R

O

N

A

0

0

2

1

0

0

0

1

0

0

8

0

0

1

1

0

6

,

8

4

,

2

4

3

8

4

/

3

M

R

O

N

C

0

0

8

1

0

0

6

1

0

0

4

1

0

0

2

1

0

6

,

8

4

,

2

4

0

1

1

4

/

3

M

R

O

N

C

0

0

8

1

0

0

6

1

0

0

4

1

0

0

2

1

0

6

,

8

4

,

2

4

8

3

1

4

/

3

M

R

O

N

A

0

0

8

1

0

0

6

1

0

0

4

1

0

0

2

1

Adjusting Airflow (Variable Speed Motor Equipped Units Only)

Table 4

DEHUMIDIFY

CUT TO ENABLE

COOL

HEAT

ADJUST

NORM

A
B
C
D

A
B
C
D

(+)
(–)

TEST

D1

ADJUST, HEAT,

and COOL Taps
and Dehumidify

Resistor

on Interface

Board

Содержание 4PGE

Страница 1: ...it WARNING INSTALLATION AND MAINTENANCE INSTRUCTIONS 4PGE SG 13 15 Series Gas Heating Electric Cooling Package Unit Save these instructions for future reference The installation of the furnace wiring...

Страница 2: ...er charge and airflow may reduce energy efficiency and shorten equipment life Inspection As soon as the unit is received it should be inspected for possible damage during transit If damage is evident...

Страница 3: ...pers that will provide continuous heating is not allowed The return air duct must be provided and sealed to the unit Return air temperature must be maintained between 60 F 16 C and 80 F 27 C Air filte...

Страница 4: ...above any door window or gravity air inlet into the building The vent system shall terminate at least 3 above any forced air inlet located within 10 The unit shall be installed in a manner such that s...

Страница 5: ...nnected to the venting system being placed into operation while all other appliances connected to the common venting system are not in operation 1 Seal any unused openings in the common venting system...

Страница 6: ...pening Filters Air filters are to be used with this heating cooling unit Filters are not factory supplied in the unit However a filter frame accessory is available from the manufacturer that allows fi...

Страница 7: ...trap drip leg shall be installed as close as practical to the gas supply inlet of the unit LPG Propane Units Tanks and Piping Units are shipped equipped for natural gas but can be converted to LPG pro...

Страница 8: ...wiring must be sized to carry minimum circuit ampacity marked on the unit Use copper conductors only Each unit must be wired with a separate branch circuit and be properly fused Thermostat The room t...

Страница 9: ...Used WITHOUT ECONOMIZER L2 L1 POWER WIRING 208 230 1 60 75 C MIN WIRE POWER WIRING 24V CONTROL WIRING NEC CLASS 2 GROUND SCREW SINGLE PHASE L1 L2 L3 GROUND SCREW POWER WIRING 200 230 3 60 460 575 3 6...

Страница 10: ...hould the supply pressure during standby exceed 13 w c nor should it be less than 5 w c for For Your Safety Read Before Lighting natural gas or 11 W C for propane gas with the burners in operation If...

Страница 11: ...contained factory optimized refrigerant system and should require no adjustments when properly installed If however unit performance is questioned perform the following checks OPERATION The heating v...

Страница 12: ...t work for air leaks as well as restrictions and blower speed settings If unit performance remains questionable remove charge evacuate to 500 Microns and weigh in refrigerant to name plate charge It i...

Страница 13: ...loperateswhenahightemperature condition caused by inadequate airflow occurs This causes the ignition control to close the gas valve The circulation air blower continues to operate in this situation Pr...

Страница 14: ...low tipping of the natural gas burner flame or long yellow tips on propane may be caused by lint accumulation or dirt inside the burner or burner ports at the air inlet between the burner and manifold...

Страница 15: ...506488 01 Page 15 Issue 1008 Figure 11 Connection Diagram Single Phase PSC Motor...

Страница 16: ...N 75 C WIRE WARNING ELECTRIC SHOCK HAZARD UNIT MUST BE GROUNDED IN ACCORDANCE WITH NATIONAL AND LOCAL CODES HEAT ANTICIPATION SETTING 0 70 AMP LINE VOLTAGE FIELD INSTALLED SEE BLOWER SPEED CHART BLK S...

Отзывы: