70380601
83
© Copyright, Alliance Laundry Systems LLC – DO NOT COPY or TRANSMIT
Hybrid Timer Control Troubleshooting
35. Vend Satisfied, No In Use LED – Coin Models
Vend Satisfied,
No In Use LED –
Coin Models
Is
there voltage
at the input
side of the
primary fuse?
Is
there voltage
at the input
side of the
transformer?
Is
there voltage
at the output
side of the
transformer?
Is
there voltage
at the input
side of the
secondary
fuse?
Is
there voltage
at the output
side of the
secondary
fuse?
Correct wiring
between the
primary fuse
and the
terminal block.
No
Yes
Correct wiring
between the
transformer
and the
secondary
fuse.
Yes
Replace
secondary
fuse.
Is
there voltage
at the output
side of the
primary fuse?
Replace the
primary fuse.
Correct wiring
between the
primary fuse
and the
transformer.
Replace
transformer.
Yes
No
Yes
No
No
No
Yes
No
Is
there voltage
at COM of the
door switch?
Correct wiring
between the
secondary
fuse and COM
of the door
switch.
No
continued on
next page
TMB2022S-a
(1)
(2)
(3)
(4)
(5)
(6)
(7)
Is there
power to the
conrol of H1-1
and H1-3?
Yes
Yes
Correct wiring
between
fuse and
control.
No
(8)
Yes
Содержание YT025E
Страница 2: ......