
SECTION 2
OPERATIONS
050362
Page 40
To string line your screed, there are a few im-
portant steps that need to be followed.
• Place screed ends on a 2 x 6 or other wooden
type support.
• At approximately 1” out from the leading
edge of the screed blade, drive a nail into the
wooden support. NOTE: Nail should be on the
outside of the wooden support.
• Stretch a line as tight as possible from nail to
nail. Make sure that the nail is contacting each
support at the pint of blade contact.
• NOTE: The supports do not have to be on the
same level.
•
Use a short, flat piece of metal or wood as a
gauge block to compare the string to the bot-
tom surface of the screed blade and bull-float
blade.
• The blades should be equal to each other at
each splice. If they are not even, loosen jam
nuts and tighten top pipe coupler as described
on page 33.
String Lining
Содержание SSE12
Страница 1: ...OPERATIONS PARTS MANUAL SSE12 SCREED Manual Part 064633 I REVISION B ...
Страница 17: ...SECTION 1 SAFETY 050362 Page 17 SECTION 1 SAFETY ...
Страница 18: ...SECTION 1 SAFETY 050362 Page 18 State Regulations Proposition 65 Warning ...
Страница 19: ...SECTION 1 SAFETY 050362 Page 19 Federal Regulation Respiratory Hazard ...
Страница 30: ...SECTION 1 SAFETY 050362 Page 30 Notes ...
Страница 31: ...SECTION 2 OPERATIONS 050362 Page 31 SECTION 2 OPERATIONS ...
Страница 41: ...SECTION 3 SERVICE 050362 Page 41 SECTION 3 SERVICE ...
Страница 43: ...SECTION 4 PARTS 050362 Page 43 SECTION 4 Parts ...
Страница 70: ...SECTION 4 PARTS 050362 Page 70 4 13 End Mount Engine Assembly Illustration ...