
SECTION 2
OPERATIONS
050362
Page 33
Operating your air powered screed correctly will greatly produce the outcome of the pour. Follow the instructions
below to operate your screed correctly and you will be very pleased with your equipment.
THE JOB SITE:
FORMS
• Are they Stable?
• Will they support the weight of the screed?
• Have the form pins been driven below the top of the forms?
• Can the screed pass from form to form without getting caught?
COLUMNS & WALLS
• Screed size is important.
• How will they support the weight of the screed?
• Consider the use of HD winches & 6” extension handles.
• What do you do when you are up against a wall?
a) wall bracket b) pipe rail c)form
CONCRETE
• Are there any mix characteristics or additives that effect the performance of the screed?
• Will the supply of concreete be steady or intermittent?
Be aware of the importance of WEATHER!
THE CREW
• Two key people should be trained to operate the scree.
•
The screed is a finishing machine, there is a technique to its operation. The TRAVEL SPEED, the VIBRATORY FRE
-
QUENCY, and the FEEDING of the screed must all be controlled.
• Knowing how the winches operate before you start is essential.
• To what do you hook the cables.
• Tools and spare parts should be on the job.
Operating Instructions
Содержание SSE12
Страница 1: ...OPERATIONS PARTS MANUAL SSE12 SCREED Manual Part 064633 I REVISION B ...
Страница 17: ...SECTION 1 SAFETY 050362 Page 17 SECTION 1 SAFETY ...
Страница 18: ...SECTION 1 SAFETY 050362 Page 18 State Regulations Proposition 65 Warning ...
Страница 19: ...SECTION 1 SAFETY 050362 Page 19 Federal Regulation Respiratory Hazard ...
Страница 30: ...SECTION 1 SAFETY 050362 Page 30 Notes ...
Страница 31: ...SECTION 2 OPERATIONS 050362 Page 31 SECTION 2 OPERATIONS ...
Страница 41: ...SECTION 3 SERVICE 050362 Page 41 SECTION 3 SERVICE ...
Страница 43: ...SECTION 4 PARTS 050362 Page 43 SECTION 4 Parts ...
Страница 70: ...SECTION 4 PARTS 050362 Page 70 4 13 End Mount Engine Assembly Illustration ...