11. ROLLER TAMPER
- The ACP Roller Tamper is an option that
provides a means of achieving a more uniform concrete surface
with the desired density. It seals difficult to finish concrete, due
to harsh mix design, low slump specifications and wind exposure,
causing abnormal surface drying and unforeseen delays.
Place a four foot level under the paving rollers and under the
Roller Tamper’s finned rollers. Loosen the locking set screws and
the lock nuts for the roller pitch adjustment on both sides of the
Roller Tamper. Normally the front and back of the finned rollers
are set to grade.
The Roller Tamper finned rollers are vertically adjustable
from 1/2 inch above concrete grade to 3/4 inch below concrete
grade. The depth of penetration can vary according to job require-
ments. Pitching the front end of the rollers allows the Roller Tamper
to remain parallel to the concrete grade when the rear of the
machine is raised with the leg cranks. Maximum recommended
depth is 3/16 inch.
To check vibration levels use the Vibra-Tak provided and follow
instructions. Run the vibrator at the speed that does the best job of
keeping the fins of the rollers clean. Normally 3500 to 5000 VPMs is
a good operating speed.
Do not exceed 5000 VPMs
.
Roller Tamp Speed
SECTION 2
OPERATIONS
050362
Page 36
2.5 - Machine Setup, continued
Содержание BDF4836B
Страница 5: ...050362 Page 5 Table of Contents continued ...
Страница 14: ...050362 Page 14 Notes ...
Страница 15: ...SECTION 1 SAFETY 050362 Page 15 SECTION 1 SAFETY ...
Страница 21: ...SECTION 1 SAFETY 050362 Page 21 PAGE LEFT BLANK INTENTIONALLY ...
Страница 22: ...Notes SECTION 1 SAFETY 050362 Page 22 ...
Страница 23: ...SECTION 2 OPERATIONS 050362 Page 23 SECTION 2 OPERATIONS ...
Страница 40: ...Power Crown Lever Nut A SECTION 2 OPERATIONS 050362 Page 40 2 6 Power Crown Option ...
Страница 46: ...Skew Clamp Skew Cylinder SECTION 2 OPERATIONS 050362 Page 46 2 7 Paving Operations continued ...
Страница 49: ...SECTION 2 OPERATIONS 050362 Page 49 PAGE LEFT BLANK INTENTIONALLY ...
Страница 50: ...SECTION 2 OPERATIONS 050362 Page 50 Notes ...
Страница 51: ...SECTION 3 SERVICE 050362 Page 51 SECTION 3 SERVICE ...