Fiber Optic Cable Installation and Handling 
Instructions 

Introduction 

Fiber optic cables can be easily damaged if they are improperly handled or 
installed. It is imperative that certain procedures be followed in the handling 
of these cables to avoid damage and/or limiting their usefulness. The 
information contained in this manual should serve as a guide to proper 
handling, installing, testing, and for troubleshooting problems with fiber 
optic cables. 

For:

See page:

Overview

Fiber Optic Cable Pulling Techniques

Routing Fiber Optic Cables

Installation Checklist

Cleaning Techniques for Fiber Optic Cables

Fiber Optic Cable Attenuation Measurements

Plastic Fiber Optic Cable Attenuation Limits

12 

SERCOS Attenuation Limits

15 

System Field Testing Overview

16 

Configuring Light Source

18 

Physical Test Mode for Connections 

19 

Fiber Optic Cable Specifications

25 

Rockwell Automation Support

BackCover 

Содержание 2090-SCEP0-1

Страница 1: ...uld serve as a guide to proper handling installing testing and for troubleshooting problems with fiber optic cables For See page Overview 2 Fiber Optic Cable Pulling Techniques 3 Routing Fiber Optic C...

Страница 2: ...dule for the appropriate cable lengths to ensure proper operation You may experience additional attenuation loss when using bulkhead connectors to join cables even when the total length is less than m...

Страница 3: ...nts and make sure they are compatible with the cable jacket On runs over 100m use proper lubricants and pull from the middle out to both ends If possible use an automated puller with tension control o...

Страница 4: ...one side of the 8 and takes it out on the other preventing twists Figure 3 Prevent Twisting the Cable By Laying Cable in a Figure 8 Pattern 1 Lay cable on floor in a figure 8 pattern 2 Turn Figure 8...

Страница 5: ...fiber optic cables in raceways and conduits with copper cables to avoid excessive loading or twisting Figure 4 Using Raceways and Conduits Protect cables from excessive or frequent bending Cables do...

Страница 6: ...ally with gentle pressure Figure 6 Proper Use of Plastic Clamps Installation Checklist Use the following installation checklist to ensure proper handling Installation Procedure Complete Comments Maxim...

Страница 7: ...n Always use a clean area of the swab for each connector When in doubt use a fresh wipe Follow up the wet wipe cleaning with a dry wipe to remove any residue Use canned air to remove any lint from the...

Страница 8: ...Figure 7 Zero dB Reference 3 Turn on light Source 4 Turn on optometer and select appropriate wavelength 5 Verify Output Power a POF reference cable 7 5dBM to 3 5dBM b HCS reference cable 18dBM to 10d...

Страница 9: ...tion Measurement with Bulkhead Connector 1 Inspect ends of cable for proper termination Clean ends of fiber 2 Turn on light Source 3 Securely connect appropriate reference cable corresponding to the t...

Страница 10: ...to verify that the cable under test is within specification listed in the table for that specific catalog number 8 Reverse the cable and test again starting at step 2 Recommended Equipment List 650 nm...

Страница 11: ...n calculations for cables 100m HCS Cable Attenuation Cable Loss Connector Loss Finishing Tolerance HCS Cable Attenuation 15 4 log Lkm Lkm 1 5dB 0 5dB Catalog Number Length meters inches Maximum Attenu...

Страница 12: ...ength 1 5dB 0 5dB Catalog Number Length meters inches Maximum Attenuation dB Maximum Attenuation With Bulkhead Conn 2090 SCEP0 1 0 1 4 2 02 5 02 2090 SCEP0 2 0 2 7 2 04 5 04 2090 SCEP0 3 0 3 12 2 06 5...

Страница 13: ...With Bulkhead Conn 2090 SCNP0 1 0 1 4 2 02 5 02 2090 SCNP0 3 0 3 12 2 06 5 06 2090 SCNP0 9 0 9 35 2 17 5 17 2090 SCNP1 0 1 39 2 19 5 19 2090 SCNP3 0 3 118 2 57 5 57 2090 SCNP5 0 5 197 2 95 5 95 2090 S...

Страница 14: ...With Bulkhead Conn 2090 SCVP0 1 0 1 4 2 02 5 02 2090 SCVP0 3 0 3 12 2 06 5 06 2090 SCVP0 9 0 9 35 2 17 5 17 2090 SCVP1 0 1 39 2 19 5 19 2090 SCVP3 0 3 118 2 57 5 57 2090 SCVP5 0 5 197 2 95 5 95 2090 S...

Страница 15: ...standard cable to an optometer SERCOS has system attenuation limits which are governed by the minimum light power required for proper operation of the receiver SERCOS generally includes a bulkhead co...

Страница 16: ...tput Power Verify transmitter power as outlined below Figure 10 Field Testing Transmitter Output Power 1 Inspect and clean the ends of the reference cable 2 Put the Source into Continuous light mode H...

Страница 17: ...mode High power output 4 Turn on optometer and select appropriate wavelength 5 Put the meter into the absolute power measurement mode dBm 6 Securely connect appropriate reference cable corresponding t...

Страница 18: ...the 9 00 position to enable continuous light output mode 2 Power up the drive The drive is outputting in continuous light mode at maximum output power Configure KinetixTM family drive as test light so...

Страница 19: ...e between the control unit and its associated drives to transmit periodic and non periodic data The module provides three tri color LED indicators to show the state of the system The LEDs are located...

Страница 20: ...ce closes all connections upon execution which shuts down motion It is recommended that all motion be shut down prior to executing this instruction The SERCOS fiber transmit cable should also be disco...

Страница 21: ...on the desired rung Figure 14 MSG Instruction Faceplate Right mouse click on the Message Control operand field and select New Tag Enter a name for the tag and make sure Message is the value in the Da...

Страница 22: ...the values for the test Figure 15 Message Configuration Tab Enter the following values for the fields on the Configuration Tab screen Message Type CIP generic Service Type Custom Service Code 51 hex...

Страница 23: ...must be set to 2 bytes Destination Field The resp_string must be set to a INT array of 1 There is no response specific data for this instruction Message Instruction Communications Tab Click on the Co...

Страница 24: ...Tab Click on the Tag Tab to access the Message Instruction Tag screen Figure 17 Message Tag Screen Accept the CIP message instruction defaults The following example sets the Continuous Light test mod...

Страница 25: ...SCVG150 0 150 5905 30 1 2 98 22 490 N 5 cm Avoid 2090 SCVG200 0 200 7874 30 1 2 98 22 490 N 5 cm Avoid Catalog Number Length meters inches Long Term Bend Radius No Load mm in Maximum Tensile Load New...

Страница 26: ...P15 0 15 591 25 4 1 0 70 15 0 4 N m 5 2090 SCNP20 0 20 787 25 4 1 0 70 15 0 4 N m 5 2090 SCNP25 0 25 984 25 4 1 0 70 15 0 4 N m 5 2090 SCNP32 0 32 1260 25 4 1 0 70 15 0 4 N m 5 2090 SCVP0 1 0 1 4 40 0...

Страница 27: ...EN P April 2005 2090 SCVP20 0 20 787 40 0 1 6 245 55 0 4 N m 5 2090 SCVP25 0 25 984 40 0 1 6 245 55 0 4 N m 5 2090 SCVP32 0 32 1260 40 0 1 6 245 55 0 4 N m 5 Catalog Number Length meters inches Long...

Страница 28: ...shooting we offer TechConnect Support programs For more information contact your local distributor or Rockwell Automation representative or visit http support rockwellautomation com Installation Assis...

Отзывы: