SW-375 DC OPERATOR PLACEMENT
AND ARM LAYOUT
X
CENTER OF HINGE
X
POINT
Y
POINT
Z
Step 1:
Ÿ
With the gate in the closed position, mark the ground directly below the center of the gate bracket. This will be
point .
Y
Ÿ
With the gate in the open position, mark the ground directly below the center of the gate bracket. This will be
point .
Z
BRACKET
GATE IN OPEN POSITION
GATE IN CLOSED POSITION
Step 2:
Ÿ
Chalk out a line connecting point
Y
Z
and going past point as shown in the drawing below.
Ÿ
The center of the operator shaft goes on this line. Bolt down operator.
X
X
CENTER OF HINGE
BRACKET
POINT
Y
GATE IN CLOSED POSITION
POINT
Y
GATE IN CLOSED POSITION
POINT
Z
GATE IN OPEN POSITION
CENTER OF
OPERATOR
SHAFT
CHALK LINE ON
THE GROUND