![Aliaxis Friatec Frialen DAV RED SNAP Скачать руководство пользователя страница 16](http://html1.mh-extra.com/html/aliaxis/friatec-frialen-dav-red-snap/friatec-frialen-dav-red-snap_assembly-instruction-manual_2896267016.webp)
16
2546 ·
Stand/Update: 05.2020
EN
2.1
Preliminary works
2.1.1 Measure and mark fusion zone, remove oxid layer
Fig 1
First remove all contaminants on the
pipe surfaces to be fused (see Fig 1).
Use always a clean and grease-free
cleaning paper.
Fig 2
We recommend using marking (con-
trol) lines that confirm a consistent
removal of material over the whole
surface (see Fig 2).
Fig 3
Directly
before installation, you must
use a scraper tool (see Fig 3) to
remove
completely the oxide layer at
the fusion zone.
Содержание Friatec Frialen DAV RED SNAP
Страница 26: ...26 2546 Stand Update 05 2020 EN...
Страница 27: ...27 2546 Stand Update 05 2020 EN...