![alfaplam GRANDE Скачать руководство пользователя страница 3](http://html.mh-extra.com/html/alfaplam/grande/grande_instruction-for-use-and-installation-instructions_2895602003.webp)
3
1.0 CONTENTS OF MANUAL
The Manual is intended for the users so that they could undertake all necessary measures and preparations to
ensure proper use of the unit
.
1.1 UPDATING
These guidelines support the technology of the boiler placed on the market at the time and because owing to that
ALFA PLAM does not respect the existing devices with the appropriate technical documentation as flawed and
inadequate. After each change, adaptation and application of new technologies on the new device, the changes of
the instructions are made.
The contents of this manual should be carefully read and accepted. All the information that this guide contains are
necessary for the installation, use and maintenance of your boiler.
Instructions should be carefully and securely stored. Instructions for use, maintenance and installation are an
integral part of the pellet boiler unit.
In the event that another person becomes the owner of the boiler, instruction manual should be submitted with the
boiler
.
2.0 RESPONSIBILITY OF THE MANUFACTURER
By submitting instructions, ALFA PLAM a.d. rejects any civil and criminal liability, both directly and indirectly due
to:
-
accidents caused by failure to comply with the standards and specifications of the instructions
-
accidents caused by illegal and improper use by the user
-
accident that occurred because of modifications and repairs that are not approved by ALFA PLAM
-
poor maintenance
-
unpredictable situations
-
accidents caused by the use of unoriginal and incompatible spare parts
The installer is fully responsible for the installation
2.1 RESPONSIBILITY OF THE USER
The user has to meet the following requirements:
-
He must be adult and responsible person
-
He must have technical knowledge for routine handling of electrical and mechanical parts of the boiler
IT IS FORBIDDEN FOR THE CHILDREN TO BE NEAR THE BOILER WHEN THE BOILER IS IN
OPERATION
2.2 BASIC PREVENTIVE REQUIRED STANDARDS
1) Directive 73/23/EEC
2) Directive 85/374/EEC
3) Directive 89/106/EEC
4) Directive 89/336/EEC
5) Directive 89/391/EEC
6) Directive 1999/05/EEC
2.3 TRANSPORT AND HANDLING OF PELLET BOILERS
Handling must be safe, pay attention to the ends of the boiler when the boiler needs to be moved to another
location, first make sure that the capacity of the palette forklift is big enough to raise the boiler. Do not make
sudden and unexpected movements. The manipulation of the boiler in terms of lifting, moving or relocation can be
done by a rod mounts that are threaded on one end. These carriers (4 pieces) are screwed on specified places on
both sides of the boiler (see Fig. 1). For this activity 4 people are needed.
Supports are delivered with the
boiler
.
Содержание GRANDE
Страница 31: ...31 16 0 DIMENSIONS OF BOILER GRANDE Figure 17 ...