6 Maintenance
6.1
Service and repair of ATEX/IECEx certified machines
Warning:
In case of extensive machine wear, the machine is to be replaced, as it is not possible to repair Rotary
Spray Head machines.
Please remember to order an ATEX/IECEx approved Rotary Spray Head machine.
6.2
Service and repair of machines ordered with Alfa Laval Q-doc
In case of machine wear, the machine is to be replaced, as it is not possible to repair Rotary Spray Head machines.
Please remember to order a Q-doc version machine.
6.3
Service and repair of machines ordered with Alfa Laval Q-doc + FAT-SAT
In case of machine wear, the machine is to be replaced, as it is not possible to repair Rotary Spray Head machines.
In order to ensure full traceability and to obtain full test documentation (FAT: Factory Acceptance Test), it is necessary to
order a new Rotary Spray Head machine with Alfa Laval Q-doc. The new Rotary Spray Head machine is manufactured and
tested (FAT) and shipped to the customer with new Alfa Laval Q-doc for further qualification (SAT: Site Acceptance Test) and
validation (PV: Process Validation).
6.4
Recommended service intervals
Inspection every 500 working hours. After 2000 working hours: inspection every 200 hours.
A service consists of:
0. At a pressure of 0.3 bar open a hatch in the tank to verify rotation and liquid fans are emerging from all slots. ATTENTION: Use
only pure water at normal temperature for safety reasons.
If needed proceed to 1).
1. Un-install the machine.
2. Visual inspection for foreign objects. Remove any objects and clean before rotation verification.
3. Rotation verification by hand for free rotation.
4. Reinstall machine.
5. Fill in the Service Log.