background image

5300-0001

ESE02599-EN3

2016-07

Original manual

Instruction Manual

Alfa Laval Pharma-line S

www.sks-online.com 

www.sks-webshop.com 

Содержание Pharma-line S 1

Страница 1: ...5300 0001 ESE02599 EN3 2016 07 Original manual Instruction Manual Alfa Laval Pharma line S www sks online com www sks webshop com...

Страница 2: ...www sks online com www sks webshop com...

Страница 3: ...2 5 Cleanliness provisions 9 2 6 Connecting the heat exchanger to the piping system 9 2 7 Fitting and piping 10 3 Operation 11 3 1 Design and operating conditions 11 3 2 Operating procedures 11 3 2 1...

Страница 4: ...in this manual 1 2 Recycling information Packing Packing materials consist of wood plastics and metal Wood can be reused recycled or used for energy recovery Plastics should be recycled or burnt at a...

Страница 5: ...nology industries The Pharma line S is used in pharmaceutical water systems Water For Injection WFI Purified Water PW and for heating or cooling of pharmaceutical products It is available in a number...

Страница 6: ...g lug Vent Flange connection Leg Shell Flange connection Tube sheet Tubes are expanded into first sheet welded and expanded into second sheet Double tube sheet minimises the risk of contamination Shel...

Страница 7: ...For Pharma line S s in category I and II EC type examination and product verification from Zetterstr ms Rostfria AB Zetterstr ms Rostfria AB is certified to issue EC type examination and product veri...

Страница 8: ...racies 2 3 Positioning and slope The legs can be fixed in 4 different positions 0 90 180 and 270 which allows for a flexible installation depending on where the unit is to be installed Once the positi...

Страница 9: ...otective plugs should not be removed until just prior to installation Dirt removal The entire system should be clean before starting operation 2 6 Connecting the heat exchanger to the piping system Co...

Страница 10: ...ger The shell side is equipped with the option to vent and drain Vent and drain valves should be provided so the unit can be purged to prevent air vapour or gas binding Before use of the vent and or d...

Страница 11: ...rt up operation During start up all vent valves should be opened and left open until all passages have been purged of air and are completely filled with fluid At start up or after the unit not been in...

Страница 12: ...educe water retention after drainage the tube side of the heat exchanger should be blown out with air Temperature shocks The heat exchanger should not be subjected to sudden temperature fluctuations H...

Страница 13: ...e heat exchanger has double tube sheets and a leakage in the joint in the inner tube sheet will show as a leakage between the double tube sheets A leakage in the joint in the outer tube plate will als...

Страница 14: ...ange A B C Pharma line S 1 mm Pharma line S 1 0 1 76 1 DN50 1150 225 195 Pharma line S 1 0 3 89 1 DN50 1150 225 195 Pharma line S 1 0 4 101 1 DN50 1150 225 195 Pharma line S 1 0 6 104 1 1 2 DN50 1150...

Страница 15: ...ension T1 Tube inlet NAC plate for Tri clamp Suitable for ASME BPE T2 Tube outlet NAC plate for Tri clamp Suitable for ASME BPE M1 Shell inlet Weld neck flange DIN2635 EN1092 1 M2 Shell outlet Weld ne...

Страница 16: ...nt gaskets should be purchased in the material originally provided with your heat exchanger When ordering replacement gaskets or plate flange please refer to the item No in the spare part list for Pha...

Страница 17: ...should be purchased in the material originally provided with your heat exchanger When ordering replacement gaskets or plate flange please refer to the item No in the spare part list for Pharma line S...

Страница 18: ...of the user of this document to comply with all applicable intellectual property laws Without limiting any rights related to this document no part of this document may be copied reproduced or transmi...

Отзывы: