background image

13

Test the reversing sensitivity

For the sake of safety, it is very important to test the reversing sensitivity as soon as the control board set is 

finished.

The reversing sensitivity adjustment is inverse correlation with stall force adjustment in potentiometer A and 

B. In other word, the stall force level is higher; the reversing sensitivity level is lower.

Put an immobile object along the gate path, and then operate the gate to strike it during the open and close 

cycles. The gate must reverse as soon as object is struck with it. If the gate doesn’

t reverse, please increase 

the reversing sensitivity by turning the potentiometer A in counter-clockwise direction. (Turning the stall force 

potentiometer toward to MIN position to increase the reversing sensitivity)

Note 1: If the sensitivity setting is too higher, the gate will stop or reverses very easy by itself while 

there is little obstruction or resistance such as strong wind or heavy snow sometimes.

Note 2: Always check the gate reversing function every each time of control board set or restart after 

power off.

How to learn or erase the remote

Learn the remote

Press and release the learn button, the 

LEARN LED

light will be on, then press the key in the remote twice

in 2 seconds, the 

LEARN LED

 light will flash for 4 

seconds. Now the remote has been learnt successfully.

This control board can learn up to six remotes , if you 

want to learn more, we recommend that you buy the external receiver

LM138

.

Erase all the remote codes

Press and hold the learn button until the 

LEARN

 light is off. Now all remote codes have been erased.

How to use the remote to control the operator

Key A 

is used to operate the operator to work alternately (open-stop-close-stop-open).

When the Pedestrian Mode function is enabled, 

Key B

 is used to achieve the

Pedestrian Mode function (open the gate for the pre-setting time). When the

Pedestrian Mode function is disabled, the operator works alternately (open-stop

-close-stop-open) by pressing 

Key B

.

Содержание AC 1500

Страница 1: ...REV 13E www WholesaleGateOpener com...

Страница 2: ...lation of the Opener 6 Manual Operation 7 Installation of chain and chain brackets 7 Installation of Magnets for Limit Switches 9 Connecting Of Power Supply 10 Connecting of the Control Board 10 Setti...

Страница 3: ...before carrying out any work on the installation Also disconnect any buffer batteries if fitted Fit an omnipolar or magnetothermal switch on the mains power supply having a contact opening distance eq...

Страница 4: ...es not bind or drag on the ground The gate manual operation can be carried out smoothly along its entire run and there is no excessive side slipping The opening and closing gate stops are positioned W...

Страница 5: ...4 Parts List...

Страница 6: ...eed 15 cm second Max gate weight 600KGS 1500LBS 1000KGS 2400LBS Max torque 12Nm 24Nm Environmental conditions From 15 C to 40 C Protection class IP44 Dimensions 25 2 22 25 CM Features Midway mode Quic...

Страница 7: ...e movement of the gate and there is no danger of derailment Ensure that the safety side panels are present Necessary Tools The following tools may be necessary to install the Gate opener You will need...

Страница 8: ...The opener should be put in the manual emergency release position before fitting the rack installing the opener and limit switch The process is as follows 1 Take off the rubber stopple 2 Insert the R...

Страница 9: ...x the base plate by tightening the washers and nuts 7 Insert the opener shaft into the drive sprocket of chain box Mount the opener by tightening the bolts and washers 8 Fix the chain box by tightenin...

Страница 10: ...fully open by hand Locate and install the magnet bracket so that the opener will stop at the desired open position when the open limit switch approaches it The magnet component with N pole outside mu...

Страница 11: ...ect the live wire and neutral wire to the L 2 and N 1 terminal respectively and connect the earth wire to PE Connecting Of the Control Board 1 Motor The BLACK wire of the motor should be connected int...

Страница 12: ...inal the NC terminal to the 12 terminal 5 Wired Keypad 24VDC The RED wire of the wired keypad should be connected into the 13 terminal The BLACK wire of the wired keypad should be connected into the 1...

Страница 13: ...en 2 Potentiometers Potentiometer A and B are used to adjust the stall force and auto close time of the gate operator separately Turn potentiometer A clockwise to increase the stall force and turn it...

Страница 14: ...obstruction or resistance such as strong wind or heavy snow sometimes Note 2 Always check the gate reversing function every each time of control board set or restart after power off How to learn or e...

Страница 15: ...corrected Symptom Possible Solution s The remote control does not emit any single Check the batteries are exhausted replace them if necessary The operator doesn t run 1 Make sure that the power cord i...

Страница 16: ...www WholesaleGateOpener com 7106 S 220th St Kent WA 98032 USA sales WholesaleGateOpener com 2012 2014 ALEKO All Rights Reserved...

Отзывы: