30
© 2015 AKW
14-019-002-08
Commissioning
Functional Checks & Testing
It is important to complete the installation and record the commissioning
tests to provide a performance reference point for future tests.
Press and release the power button
Checking the Temperature Control
Checking the Flow Control
Checking the Power Button
Confirm the operation of the Temperature and Flow increase and
decrease knobs, whilst ensuring all lights are functioning
Press the Power button to revert to standby mode