31
© 2015 AKW
14-019-002-08
© 2015 AKW
13-012-085-13
30
Commissioning Tests
Commissioning
Note:
All installation, commissioning and in-service testing must be undertaken by a suitably qualified
engineer.
COMMISSIONING TESTS
Record the following information to provide a performance reference point for future in-service tests.
Max temperature setting is set to
Water supply temperature
Shower Serial Number (SN)
_____________________________________
Mains Water supply Running Pressure
Bar
Mains terminal Voltage
Vac
With shower turned on at Max flow and Max temperature setting,
record the water temperature when it is stabilised
°C
Record details of test equipment (brand, model, serial number and calibration information) used to
provide the above information, if necessary record on separate paper and attach to this instruction
booklet.
°C
°C
Date of Commissioning
/
/
© 2015 AKW
13-012-085-13
30
Commissioning Tests
Commissioning
Note:
All installation, commissioning and in-service testing must be undertaken by a suitably qualified
engineer.
COMMISSIONING TESTS
Record the following information to provide a performance reference point for future in-service tests.
Max temperature setting is set to
Water supply temperature
Shower Serial Number (SN)
_____________________________________
Mains Water supply Running Pressure
Bar
Mains terminal Voltage
Vac
With shower turned on at Max flow and Max temperature setting,
record the water temperature when it is stabilised
°C
Record details of test equipment (brand, model, serial number and calibration information) used to
provide the above information, if necessary record on separate paper and attach to this instruction
booklet.
°C
°C
Date of Commissioning
/
/