OG-FiDO-12G-Series openGear Card v3.2.1 15 www.aja.com
Figure 8. The white plastic tab for the card on the right is now upright. Both
cards are shown fully inserted.
7. Close the frame door as follows:
A. Slide the door into the frame.
B. Pull and release the door tabs to ensure the frame door is securely locked
to the frame.
8. Secure the card in the frame by the BNC connectors using the star washers
and nuts provided (
Figure 9. BNC Star Washer and Nut Installation
9. Insert the SFP fiber module into the socket until it clicks and locks. The lever
handle is on the left (
Figure 10. Fiber SFP Installation