-38-
ELECTRICAL ADJUSTMENT -7/7
<Front Section>
20. Clock Adjustment
Requirement
*
Measuring instrument: Frequency counter
Test point: CLOCK, GND
Adjustment point: L951
(1) While pressing and holding down the POWER button and the UP button, insert the AC plug.
(2) Adjust L951 so that the frequency counter indicates 72.743
±
0.073 Hz.
Hz
FREQUENCY CO UNTER
CLOCK
GND
20
L951
20
FRONT C.B PA TTERN SIDE
FRONT C.B PA RTS
SIDE
GND
KSCAN
Содержание NSX-R17
Страница 25: ... 25 SCHEMATIC DIAGRAM 3 5 HP SECTION TO MAIN C B 1 2 AMP SECTION WH101 ...
Страница 30: ... 30 SCHEMATIC DIAGRAM 5 5 PT SECTION TO MAIN C B 1 2 AMP SECTION WH001 ...
Страница 31: ...WIRING 4 4 PT C B 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 A B C D E F G H I J K L M N O P Q R S T U ...
Страница 40: ... 40 FL DISPLAY 1 1 HUA 13SS09T GRID ASSIGNMENT ANODE CONNECTION PINCONNECTION ...
Страница 41: ... 41 IC BLOCK DIAGRAM 1 2 IC LC72131D N IC BD3881FV ...
Страница 42: ... 42 IC BLOCK DIAGRAM 2 2 IC LA1845N A ...
Страница 53: ...2 11 IKENOHATA 1 CHOME TAITO KU TOKYO 110 8710 JAPAN TEL 03 3827 3111 0251431 ...