background image

50mm

  min

50mm

  min

PNV 015

PNV 018

PNV 021

3

 UNIT INSTALLATION

Unit offers five directions for installing refrigerant pipe, please installing the unit according to following installtion:
1. Knockout hole and pull out the pipes. 

4. Purifying filter installation (optional).

2. Install the unit to wall.      

5. Check the drainage.

3. Secure the unit. 

Pull out the piping and hose

Install the Indoor Unit

  1.Hook the indoor unit onto the upper portion of 

installation plate (Engage the indoor unit with the 

upper edge of the installation plate). ensure the 

hooks are properly seated on the installation plate 

by moving in left and right.

  2.Used the installation support that assemble to the 

unit housing to support the indoor unit in a angle 

about 25", than connected the piping and power 

supply cord.

 

Move the drain hose near 

to arrow mark and tape it 

with piping in a position as 

mentioned in Fig. below

Cover for the 

right piping

Cover for the 

bottom piping

Cover for the 

left piping

Drain hose

Piping

Piping direction

Right

Right rear
Right Bottom

Left Rear

Left

(Front side)

Hooks at 

installation plate

Piping

Drain hose

Fig 1-2

Отзывы: