*Installing Deco Plate and Inlet Grille (after pipeline laying and electric wiring are done).
Hanger Bolt
Bolt Sleeve
Hexagon Bolt
Mounting Rack
PP
Flat Spacer
Double Nut
Unit
0
Ceiling
Hanger bolt is 40mm below ceiling.
Bolt
Mounting Rack
According to requirements on the site,
drain pipes shall be prepared by users
on their own resources and make sure
that these are connected to drain pipes
previously available with the unit (make
sure that measures are taken to guard
against water leakage in junction areas);
heat preservation shall be available with
certain indoor drain pipes through using
heat insulant to prevent condensation.
CAUTION: drain pipe shall be positioned
high inside and low outside.
(Wall)
(Ceiling)
24
*Air Conditioner Installation Diagram
* Installing Status of Mounting Rack
* Hanger Chain Hook
* Installing
Air Conditioner
* Drain Pipe Leading-out Direction
Installation Procedures
Screw tight hexagon bolt to fix air
conditioner
Insert hexagon bolt into slot
Leveling is forbidden after air conditioner
is installed; please make adjustment
according to diagram indication.