INSTALLATION DETAILS
HMF Series 26 Version - 1
7.5 Adding the refrigerant after running the system for many years
Procedure:
1). Connect the charge hose to the 3-way service port, open the 2-way valve and the 3-way valve.
Connect the charge hose to the valve at the bottom of the cylinder. If the refrigerant is R410A, make
the cylinder bottom up to ensure liquid charge.
2). Purge the air from the charge hose.
Open the valve at the bottom of the cylinder and press the check valve on the charge set to purge the
air (be careful of the liquid refrigerant).
3) Put the charging cylinder onto the electronic scale and record the weight.
4) Operate the air conditioner at the cooling mode.
5) Open the valves (Low side) on the charge set and charge the system with liquid refrigerant.
6).When the electronic scale displays the proper weight (refer to the gauge and the pressure of the low
side), disconnect the charge hose from the 3-
way valve’s service port immediately and turn off the air
conditioner before disconnecting the hose.
7). Mount the valve stem caps and the service port
Use torque wrench to tighten the service port cap to a torque of 18N.m.
Be sure to check for gas leakage.
7.6 Re-installation while the indoor unit need to be repaired
1. Collecting the refrigerant into the outdoor unit
Electronic scale
Содержание AWAU-YMF007-H11
Страница 17: ...WIRING DIAGRAM HMF Series 17 Version 1 AWSI HMF024 N11...
Страница 18: ...WIRING DIAGRAM HMF Series 18 Version 1 6 2 Outdoor Unit AWAU YMF007 H11 AWAU YMF009 H11 AWAU YMF012 H11...
Страница 19: ...WIRING DIAGRAM HMF Series 19 Version 1 AWAU YMF018 H11...
Страница 20: ...WIRING DIAGRAM HMF Series 20 Version 1 AWAU YMF024 H11...
Страница 72: ...HMF Series 72 Version 1 SERVICE MANUAL HMF Series...