Airwell AW-XDO009-H11 Скачать руководство пользователя страница 5

5

1.3 

1.4 

EN

GENERAL

Description

The air conditioning unit XDO is the new solution that represents 
a significant step towards reducing the aesthetic impact of air 
conditioners. With a depth of just 16 centimetres, XDO is the most 
compact and least bulky of the category. The aesthetic impact is 
therefore minimal.

Optimised Capacities
The conditioning capacities of XDO have been optimised so as 
to obtain the right temperature for the best level of comfort and, 
therefore, less consumption and less noise.
Thanks to the careful choice of sound insulation materials, the 
noise is similar to that of a standard wall split unit and consumption 
is drastically contained thanks to the new direct current fan.

BLDC inverter technology
We have perfected the inverter technology to offer the best in 
terms of acoustic comfort (noise) and performance: reduction of 
consumptions, maintenance of the best temperature level and 
humidity level in the room.
Thanks to the use of the cutting edge BLDC (brushless direct current) 
inverter regulation, vibrations have been completely eliminated 
and acoustic emissions have been lowered to exceptional levels.
The fan motor is of the BLDC direct current type to further reduce 
energy consumption and to make flow regulation more accurate.
The energy consumption is extremely reduced thanks to absorption 
values falling down under 300 W in the case of partial load. At the 
nominal cooling power XDO, in the DC Inverter versions, has an 

EER more off 4.5, this is the cutting edge in the sector of monobloc 
climate control systems with fixed installation.

Easy to install
XDO can be installed on any wall, in a high or low position.
Everything that is required for installation (assembly template, 
support brackets), except for the drill of course, is contained in the 
packaging.

Remote control and on-board touch-screen display
In addition to the remote control, the touch-screen display on the 
unit enables the setting of any function. There's even a "lock" mode 
to avoid any improper use.
With a simple action on the touch screen display, the "heating" 
function can be deactivated: the appliance will then operate in 
"cooling" only.
The orientation of the air flaps, upwards or downwards, can also be 
set by simply pressing a key.

The packing is made of suitable material and carried out by 
expert personnel.
All units are checked and tested and are delivered complete 
and in perfect conditions, however please perform the 
following instructions to check the quality of shipping 
services:
-  upon receipt, check if the box is damaged. If that is 

the case, accept the goods with reservations and keep 
photographic evidence of any damage found

unpack and check the contents against the packing list.

-  check that none of the parts have been damaged 

during shipment. In case of damage, report it to the 
shipping company within 3 days of receipt by registered 
letter with return receipt and attaching photographic 
documentation. A copy should also be sent by fax to 

the MANUFACTURER.No notice of damage incurred will 
be accepted after 3 days from delivery.

 

  Keep the packing at least for the duration of the 

warranty period, in case you need to ship the air-conditioner 
to the service centre for repair.
Dispose of the packing materials in compliance with current 
regulations on waste disposal.

Storage

Store the box in a closed environment protected from 
atmospheric agents and isolate it from the floor usingplanks 
or pallets.

  Do not turn the carton upside down

 
 

Содержание AW-XDO009-H11

Страница 1: ...XDO Direct expansion console water source DC Inverter technology Silent heat pump EN Installation manual...

Страница 2: ...ronic equipment 2011 65 EC RoHS2 Waste electrical and electronic equipment 2012 19 EC WEEE Energy consumption indication on the labels of energy related products 2010 30 EU ErP Directive 2009 125 EC a...

Страница 3: ...parts 2 Installation Installation method Choosing the position of the unit Assembling the unit Condensation drain preparation Mounting the appliance on the bracket Hydraulic connection Electrical con...

Страница 4: ...l Technical Assistance Service Repairs or maintenance must be performed by the Technical Assistance Service or by qualified personnel in accordance with this manual Do not modify or tamper with the ap...

Страница 5: ...n a high or low position Everything that is required for installation assembly template support brackets except for the drill of course is contained in the packaging Remote control and on board touch...

Страница 6: ...attery Installation manual Handling The unit is packed singularly in a cardboard box Boxes can either be carried singularly by hand by two operators or loaded on a forklift truck for a maximum of thre...

Страница 7: ...s Air outlet flaps Touch screen display Front panel Water input Eurokonus M 3 4 Water output Eurokonus M 3 4 Internal air intake grille Air Filter Anti lifting bracket Room air probe Power supply term...

Страница 8: ...avoid malfunctions or dangerous situations the location of the unit must meet the following requisites Respect the minimum distances indicated in the diagram The wall on which you intend to anchor the...

Страница 9: ...w density place a bracket if necessary on the outside that can support the appliance safely The manufacturer cannot be held responsible for any underestimation of the structural consistency of the anc...

Страница 10: ...t is necessary to add a siphon before placing the pipe into the main drain This siphon must be placed at least 300 mm under the mouth of the appliance If the line flows into a container e g a tank do...

Страница 11: ...les sand rust slag or any foreign bodies that may damage the system It is advisable to provide a by pass in the system in order to be able to wash the exchanger without having to disconnect the applia...

Страница 12: ...ces to be integrated for safety KEY TO SYMBOLS 1 Temperature probe 2 Anti vibration joint 3 Exhaust valve 4 Mesh filter 5 6 Shut off valve 7 Safety valve 8 Expansion tank for pressure surges 9 Flow sw...

Страница 13: ...characteristics of water During the initial start up the specialised technician must measure the system water reference values using the special test kits System water reference values pH Electrical c...

Страница 14: ...ith suitable protections against overloads and or short circuits using a 10 Amp Time delay fuse or other equivalent devices is recommended To prevent any risk of electrocution always disconnect the ma...

Страница 15: ...to a free non live contact the appliance is put is stand by and CP appears on the display Using this contact it is possible to connect an external device that inhibits the functioning of the applianc...

Страница 16: ...the lower hole Remove the upper grill Remove the two plastic side panels by moving them up Unscrew the fixing screws Remove the front panel Place the bottom cover and fix it with the supplied screws o...

Страница 17: ...he night button for 10 seconds ds disabled or En enabled will appear on the display Open CP contact Touch screen display key lock Hotel function Display indications Cause E1 Faulty room temperature RT...

Страница 18: ...lop or where there are humidity and temperature conditions that exceed the maximum levels reported on the installation manual Clean the air filter regularly as described in the specific paragraph Befo...

Страница 19: ...o start up the appliance after a period of inactivity NB before performing any operation take care with the hot and or sharp surfaces of the metal The filter is located in the top part of the applianc...

Страница 20: ...ncreased for example a door or a window has been left open or an appliance has been installed in the room which generates a lot of heat Try to reduce the heating and cooling load of the room following...

Страница 21: ...cooling mode 45 C Minimum operating temperature in cooling mode 7 C Maximum operating temperatures in heating mode 40 C Minimum operating temperatures in heating mode 7 C Operating limits Technical sp...

Страница 22: ...22...

Страница 23: ...e Vertr glichkeit compatibilidad electromagn tica 2009 125 UE Ecodesign co conception Progettazione ecocompatibile Ecodesign Ecodise o 2011 65 UE RoHs Unit manufactured and tested according to the fol...

Страница 24: ...AIRWELL RESIDENTIAL 3 Avenue du Centre Les Quadrants B timent A 78280 GUYANCOURT France Tel 33 0 1 76 21 82 00 www airwell pro fr contact airwell res com...

Отзывы: