AS4000 Subscriber Terminal
Installation and Commissioning
DLP 009
605-0000-454
Draft Issue 1.3 Date 8/02/00
Page 2 of 18
The installation kit consists of:
Part Number
Description
Quantity
Use
454-0010-069
RJ11 Data cables
16
SIU to Krone
403-0010-251
Earth Brackets for SIUs
4
Fix SIU to enclosure
175-8000-003
M3 x 8mmPanhead Screw
5 (1 spare)
192-8000-006
M3 Coil washer
5 (1 spare)
Fix Earth Bracket to SIU
212-8000-049
90
°
F-type adapters
4
Fit to SIU F-type
175-8000-024
M8 x 40mm Dyna-bolt
4
Fix Plinth to floor
175-8000-025
M8 x 90mm Dyna-bolt
4
Fix enclosure to wall
175-8000-026
M8 x 70mm Coach Screw
4
Fix enclosure to wood
192-8000-014
M8 Plain Washer
4
Use with Coach Screw
TBA
Universal Bush
4
Use with T10 Dropcable
STEP
PROCEDURE
1.
Securing Enclosure to Wall
1.
Disconnect the power management ribbon from the cover of Battery and PSU
compartment. Remove the cover. The cover is secured by two ‘quarter turn’
fasteners at the side of the lid above and below the fuse holders. Disconnect the
Molex connectors to the PCB and the earth connection to the cover. Place cover
in a safe place.
2.
Separate the Plinth from the Enclosure by removing the four M8 bolts from the
front and rear of the Enclosure
3.
Remove the Blanking Plugs from the top two fixing holes in the rear of the
Enclosure.
4.
Using the enclosure as a template, mark the first hole position.