AS4000 Subscriber Terminal
Installation and Commissioning
IXL 001
605-0000-454
Draft Issue 1.3 Date 8/02/00
Page 2 of 10
Installation Process GSI-005
1.
Delivery Inspection ................................................................................................. 1
2.
Unpacking Inspection.............................................................................................. 1
3.
R series Telephony Installation and Commissioning ................................................. 2
4.
S series Telephony Installation and Commissioning.................................................. 4
4.1 S series Installation Check List.
5
5.
B Series Installation and Commissioning.................................................................. 6
5.1 B Series Installation Check List.
7
6.
L Series Installation and Commissioning.................................................................. 8
6.1 L Series Installation Check List.
9
7.
N Series Installation and Commissioning ............................................................... 10
8.
M Series: Installation and Commissioning............................................................. 12
8.1 M series Installation Check List.
13
DETAIL LEVEL PROCEDURES:
DLP
SECTION 2 INSTALLING R, S, N, L, B SERIES COMMON COMPONENTS
Preparatory Tasks .............................................................................................. DLP-001
1.
Site Readiness ......................................................................................................... 1
2.
Site Selection .......................................................................................................... 1
3.
Power Availability ................................................................................................... 2
Installing the Antenna (Wall Mount) ................................................................. DLP-002
1.
Antenna Positioning and Securing. .......................................................................... 1
2.
Lightning Protection................................................................................................ 5
Installing The Antenna (Pole Mount). ................................................................ DLP-003
1.
Antenna Positioning and Securing. .......................................................................... 1
2.
Lightning Protection................................................................................................ 2
IF drop Cable Installation .................................................................................. DLP-004
1.
Drop cable installation............................................................................................. 1
2.
Drop cable Termination (Type T6) .......................................................................... 3
3.
Drop cable Termination (Type T10) ........................................................................ 4
Installing the Type 5 PSU.................................................................................... DLP-005
1.
Installing The Type-5 PSU ......................................
Error! Bookmark not defined.
1.1 PSU (Type 5) Positioning and Securing
1
1.2 AC Power Cord Installation
3
1.3 PSU earthing
3
1.4 PSU Labelling
4
Section 3: Installing The R series Service Interface Unit.. ................................. DLP-006
Section 4: Installing The SU1/2 Service Interface Unit.. .................................... DLP-007
Section 5 Installing The B, L & N series Service Interface Unit ........................ DLP-008
Section 6: M Series Installation. ......................................................................... DLP-009
Installing The M series Module Enclosure.
External connections to top of Krone Connector
15
Equipment
15