The airline to the vibrator should have the same or larger hose inner diameter (ID) as the inlet ID (pipe 
size) of the vibrator, so that pressure loss from the compressor to the vibrator is minimized. NOTE: Do 
not connect rigid piping to the vibrator. 

 

Model TB vibrators are equipped with a built-in muffler. Model TAM and TBM vibrators should be used 
in conjunction with a muffler to reduce exhaust hiss and prevent entry of foreign matter to the vibrator. 

 

 MAINTENANCE

 

 

 

WARNING:  Stored  energy  may  be  present.  Lock  out  power  during  maintenance. 
Before operating the unit, guards (if applicable) must be in place. 

 

Syntron  Pneumatic  Turbine  Vibrators  require  little  maintenance.  They  require  no  lubrication  in  the 
airline. It is recommended that an air cleaner be installed in the line to avoid rust and dirt going through 
the unit and clogging the muffler. The muffler can be removed and cleaned or replaced, if required. 

 

Periodically check the mounting hardware to ensure that it is tight. Also make sure that the maximum 
operating temperature 180°F (82°C) and the maximum air pressure 60 or 80 psi (4.2 or 5.6 kgf/cm

2

) are 

not exceeded. Refer to pages 14, 16, and 18. 

 

WARNING:  Do  not  exceed  the  maximum  air  pressure  of  80  psi  (5.6  kgf/cm

2

).  Air 

pressure  over  80  psi  (5.6  kgf/cm

2

)  may  shorten  the  life  of  the  vibrator  or  cause 

structural damage. 

 

New vibrators may be slow to start for one or more of the following reasons: 

 

  The bearings are packed with grease; excess grease will be thrown out of the bearing after 

operating for a short time. 

 

  Low temperature may cause the grease to be stiff. 

 

  Bearing seals are normally stiff when new or cold. 

 
These resolve themselves after the vibrator has run for several minutes. 

 
 

 RECOMMENDED SPARE PARTS 

 

DESCRIPTION 

QTY. 

PART NO. 

Nameplate (Models TBM - 380, 440, 510 
                                TB    - 380, 510) 

C-226185-001

 

Nameplate (Models TBM - 250, 320  
                                TB    - 250, 320) 

C-226185-002

 

Nameplate (Models TAM -100, 130, 160, 190  
                                TBM -  60, 130, 160, 190 
                                TB    - 100, 130, 160, 190) 

C-226185-003

 

Nameplate (Models TBM - 570 
                                TB    - 2000, 5000) 

C-226197-002

 

Syntron Material Handling, LLC. Label 

A-156379-A01

 

Содержание Syntron TAM

Страница 1: ...Service Instructions Syntron Pneumatic Turbine Vibrators Model TAM TB TBM AIRMATIC INC airmatic com 215 333 5600 infocenter airmatic com...

Страница 2: ...1 Syntron Pneumatic Turbine Vibrators Models TAM TB and TBM Installation Operation Maintenance...

Страница 3: ...troduction 3 Selecting the proper Bin Vibrator 4 Installation Check List 5 Installation 6 Chutes 11 Operation 11 Plumbing the Vibrator 12 Maintenance 13 Recommended Spare Parts 13 TAM Series Specifica...

Страница 4: ...rawings may be attached to this manual The information contained therein takes precedence over corresponding information printed in this manual INTRODUCTION Syntron Pneumatic Turbine Vibrators are air...

Страница 5: ...ds of the material in the sloping part of the bin only Normally this is the only place where friction between the material and the bin wall must be broken For conical bins calculate as follows 261 x D...

Страница 6: ...tor plus the maximum material in the chute See page 11 for more details INSTALLATION CHECKLIST CAUTION The warranty is void if vibrators are not properly installed During installation follow and check...

Страница 7: ...ount it diametrically opposite to the first vibrator For coarse materials mount one vibrator one third of the way up the side of the bin and the other vibrator halfway up For fine materials mount the...

Страница 8: ...3 in 5 to 8 in 3in TB 100 130 160 6 to 8 5 mm 127 to 203 mm 76 mm TBM 100 130 190 TBM 250 3 8 in 6 to 8 in 3in TB 250 9 5 mm 150 to 203 mm 76 mm TBM 320 380 440 510 570 1 2 to 5 8 in 12 to 24 in 4in...

Страница 9: ...mm welds with 3 inch 76 mm spaces between the welds Refer to Figure 2 POSITION OF THE CHANNEL AND MOUNTING PLATE FIGURE 2 If the bin plate is 3 16 inches or less 4 8 mm weld the mounting plate to the...

Страница 10: ...er the first 10 to 15 minutes of operation retighten the bolts Continue to check them periodically for tightness CAUTION A loose vibrator can cause damage to the bin and the vibrator WARNING Install a...

Страница 11: ...10 VARIOUS VIBRATOR INSTALLATIONS cont d...

Страница 12: ...books or easily measured by dumping a cup of material on a table The angle the material makes between the table and the cone is the angle of repose OPERATION CAUTION Do not operate the vibrator while...

Страница 13: ...frequency of the vibrator By throttling the flow the desired material discharge rate can be found and the natural frequency of the bin or hopper can be avoided Avoid speeds frequency at which the bin...

Страница 14: ...heck the mounting hardware to ensure that it is tight Also make sure that the maximum operating temperature 180 F 82 C and the maximum air pressure 60 or 80 psi 4 2 or 5 6 kgf cm2 are not exceeded Ref...

Страница 15: ...n changes Decibel from A scale at 1 meter and 80 psi N Centrifugal force in Newton Rule of thumb for sizing 1 Ib Vibrator Force for each 10 Ib of Bin Content at 80 psi or 9 8 N Vibrator Force for each...

Страница 16: ...15 TAM SERIES...

Страница 17: ...80 psi N Centrifugal force in Newton Rule of thumb for sizing 1 Ib Vibrator Force for each 10 Ib of Bin Content at 80 psi or 9 8 N Vibrator Force for each 10 kg of Bin Content at 80 psi Aluminum Const...

Страница 18: ...17 TBM SERIES...

Страница 19: ...r and 80 psi N Centrifugal force in Newton Rule of thumb for sizing 1 Ib Vibrator Force for each 10 Ib of Bin Content at 80 psi or 9 8 N Vibrator Force for each 10 kg of Bin Content at 80 psi Aluminum...

Страница 20: ...19 TB SERIES TB except Models 2000 5000 TB Models 2000 5000 AIRMATIC INC airmatic com 215 333 5600 infocenter airmatic com...

Страница 21: ...metals power generation and waste water treatment applications The SERVICE GROUP provides fabrication installation and maintenance services to improve bulk materials handling efficiency mechanical cle...

Отзывы: