![AIRMATIC Syntron TAM Скачать руководство пользователя страница 8](http://html1.mh-extra.com/html/airmatic/syntron-tam/syntron-tam_service-instructions-manual_2878471008.webp)
7
Parabolic bins or hoppers normally require only one vibrator for each discharge point.
Bins with sloping discharges require the vibrator to be mounted close to the transition between the
chute and bin in order to give the chute sufficient vibration for a steady flow.
Bins with vertical sides react the same as rectangular bins.
▪
MOUNTING THE VIBRATOR
Select the thickness and size of the vibrator mounting plate and drill holes for mounting. Refer to
Table
1.
TABLE 1 -
MOUNTING PLATE DIMENSIONS
VIBRATOR
MOUNTING PLATE
CHANNEL
MODEL
THICKNESS
/
SIZE
WIDTH
TAM-100, 130, 160, 190
1/4 to 1/3 in
5 to 8 in
3in
TB-100, 130, 160
(6 to 8.5 mm)
(127 to 203 mm)
(76 mm)
TBM-100, 130, 190
TBM-250
3/8 in
6 to 8 in
3in
TB-250
(9.5 mm)
(150 to 203 mm)
(76 mm)
TBM-320, 380, 440, 510, 570
1/2 to 5/8 in
12 to 24 in
4in
TB-320, 380, 510, 2000, 5000
(13 to 16 mm)
(300 to 610 mm)
(102 mm)
Determine the length of the channel iron. Refer to
Table 2.
TABLE 2 –
CHANNEL HOPPER LENGTH
HOPPER
CHANNEL LENGTH*
Less than 3/16 in
18 to 36 in
(4.7 mm)
(457 to 914 mm)
3/16 to 3/8 in
12 to 24 in
(4.7 to 9.5 mm)
(300 to 610 mm)
Greater than 3/8 in
8 to 12 in
(9.5 mm)
(203 to 300 mm)
*For vibrators with forces over 500 lb (2225 N), add 1 to 1-1/2 ft (.3 to .46 m) to the channel iron length.
CAUTION: Never mount the vibrator directly to the bin wall. It must be mounted to a
plate or channel iron welded to the bin wall. Refer to Figure 2, page 8.
Содержание Syntron TAM
Страница 2: ...1 Syntron Pneumatic Turbine Vibrators Models TAM TB and TBM Installation Operation Maintenance...
Страница 11: ...10 VARIOUS VIBRATOR INSTALLATIONS cont d...
Страница 16: ...15 TAM SERIES...
Страница 18: ...17 TBM SERIES...