6.3 

 
 
 
 
 

Electrical installation/Commissioning 
    Safety instructions listed in Chapter 1.2 must be observed 

All electrical installation to be carried out by an approved electrician in 
accordance with presented manual and wiring diagrams.    

The relevant standards, safety regulations (for instance DIN VDE 0100) 
and technical connection regulations of the energy supply company 
must be observed! 

An all-pole mains switch/isolation switch, with at least a 3 mm contact 
opening (VDE 0700 T1 7.12.2 / EN 60335-1) is mandatory by law! 

Network configuration, voltage and frequency of the power source 
must match the information on the rating plate.   

 

 

 

6.4 

Cable connection 230 V / control line (10 V=)  

On the circuit board there are areas 230 V~ and 10 V= decoupled together. In order 
to  maintain  the  galvanic  isolation  several  things  must  be  observed  with  regards  to 
connection and cable wiring within the housing.  
1. The cable entry of 

NYM

 (230 V~) always takes place through the cable entry at 

the bottom left (fig 8). 
2. The cable entry of 

LiYY

 (10 V=) control line always takes place through the cable 

entry on the top right (fig 8).   
 

The connection of the relay contacts must be according to the following 
selection criteria: 

230 V-consumers are introduced via input cable grommet 

Low voltage consumers are introduced via the control line grommet  

The relay terminal, combined with supply or control line, must take place in 
one wire. Insertion of 2 wires in the grommet is not allowed.  

In the wiring make sure that wires are placed not on the board, but on the edge 
along the housing (fig 9/10). 
For LiYY control line a maximum cable length permitted is 30m. A shield is not 
necessary. 
 

Prepunch  grommet  with  a  round  tool  or  pierce  directly  with  the  supply  line 
(fig 7, Pos. 3) 

Remove  cable  sheath  to  a  length  of  135  mm.  Strip  back  each  wire's 
insulation about 8 mm. 

Carefully slide cable through the grommet. 

The wiring diagram (SS-1083) should always be used to ensure proper wire 
placement.  

Check sealing of the connection cables and cable wires clamp. 

If  mounted  at  the  inlet  spout  the  sheathed  cable  does  not  enclose  evenly, 
the  spout  must  be  additionally  sealed  with  silicone.  Otherwise,  the  IP 
protection will be compromised. 

The  connection  cable  should  be  positioned  in  such  a  way  that  in  case  of 
water  entering,  water  may  not  penetrate  along  the  cable.  Cables  must  be 
laid in such a way that they do not run over sharp edges.  

Check the fan according to the intended use. 

Supply voltage has to match the name plate data. 

Ensure secure mounting and proper electrical installation of the device.  

Check the freewheeling of the impeller. 

All  parts  of  the  fan,  especially  screws  and  protective  grid  must  be  checked 
for tightness. Do not lose included screws!   

Ensure  that  the  necessary  protective  guard  is  installed,  as  a  device 
cannot be operated without it.  

During the trial run the fan is checked for vibrations and noise.  

Power consumption has to match the name plate data. 

 

 DANGER

 

 DANGER

 

Содержание QT 150VS

Страница 1: ...nd Operating Instructions QuietAir 150mm Axial Fan MODEL QT 150VS Variable Speed Fan 50 260m3 hr With Adjustable Timer control Variable Speed with timer Low Energy Quiet Long Life Extra Safe 80000309...

Страница 2: ...ance Chapter 3 SPECIFICATIONS DIMENSIONS M1 150 0 10V 3 0 Specifications 3 1 Product lifetime 3 2 Accessories 3 3 Dimensions Chapter 4 FUNCTION 4 0 Function description Chapter 5 CLEANING DEINSTALLATI...

Страница 3: ...and accident prevention regulations must be observed All electrical work and commissioning must be carried out only by authorized and qualified electricians Maintenance and installation work must be c...

Страница 4: ...rly installed and used for its intended purpose product complies with the valid regulations and CE guidelines at the time of its production 1 5 Transport The fan is factory packed so that it is protec...

Страница 5: ...ectrical data this must be conformed to the local supply network On the test stand fan performance was complied with DIN EN ISO 5801 1 10 Noise data The noise data which relate to distances is valid u...

Страница 6: ...on inhibit activates the fan for 15 sec to protect the motor from rapid on off switching CHAPTER 3 SPECIFICATIONS DIMENSIONS M1 150 0 10 V 3 0 Specifications Impeller 137 Electrical supply NYM 0 2 x1...

Страница 7: ...be limited internally via internal potentiometer settings In delivery condition the full scope of the control range becomes available 2 Scaling Scaling can be set through the internal potentiometer i...

Страница 8: ...sible housing parts the external housing of the fan with a damp cloth Do not use any aggressive paint solvent cleaning agents High pressure cleaner or spray water is not permitted 5 1 Cover Dismantlin...

Страница 9: ...ter unpacking and before installation the following points must be checked if any transport damage is noticed broken or bent parts free running of the impeller 6 2 Installation The QuietAir 150 is des...

Страница 10: ...and wall plugs 3 Backdraft shutter and guide vane If required backdraft shutter scope of delivery can be installed behind the guide vane fig 6 During the housing installation the guide vane must be mo...

Страница 11: ...must take place in one wire Insertion of 2 wires in the grommet is not allowed In the wiring make sure that wires are placed not on the board but on the edge along the housing fig 9 10 For LiYY contr...

Страница 12: ...with supply cable through NYM O 4 1 5mm 2 Relays with low voltage consumers Connection combined with control line through LiYY 5 0 34mm 2 Wire transfer not over the board 1 Insert and tighten the ter...

Страница 13: ...an the following need to be checked regularly Appearance of dust or dirt in the housing on the motor and impeller Free running of the impeller Appearance of excessive vibration and noise In case of pr...

Страница 14: ...rminal N L Terminal N and L have to be connected to the 230V operating voltage Terminal 5 Terminal 1 activates the low stage Terminal 6 Terminal 2 activates the high stage Terminal 7 10 VDC Terminal 3...

Страница 15: ...rocessing work wherein the setpoint of 10 V the controller will reach the maximum value of 100 Thus in the delivery state complete bandwidth set is available for both setpoint input and speed control...

Страница 16: ...peed Note Minimum air operation and minimum rate of air can be achieved by electronic temperature sensors such as the ETR Type see accessories 4 Relay output An operating message will be displayed on...

Страница 17: ...5 Schematic overview for QuietAir QT150 VS Fig 17...

Страница 18: ...failure in Chapter 8 1 Bearing noise Vibrations see Chapter 8 1 Power consumption according to the specifications on the type plate see Chapter 8 1 8 1 Troubleshooting Safety instructions listed in C...

Страница 19: ...ion mechanical loading fatigue and or other effects that could not be directly discerned should be disposed in accordance with local and international laws and regulations The same applies to auxiliar...

Страница 20: ...le electrical supply 3 Has not been subjected to issue neglect or damage 4 Has not been modified or repaired by any person not authorised by Airflow Developments Ltd 5 Has been installed in accordance...

Отзывы: