background image

6

AIRBOY | Version 1.07

Safety

2.6 Verification of operational safety

The pressure tank of the compressor is submitted to inspec-
tion. The manufacturer submitted the pressure tank to an in-
spection according to the EC Directive 2014/29 EG in conjunc-
tion with the EC type examination according to article 10 as 
well as according to EN286-1. A copy of this type examination 
certification and/or declaration of conformity is included in the 
scope of delivery of every compressor. 
The operating company must have re-inspected the individual 
components to be inspected by an expert or by a „qualified 
person“ in the perscribed intervals. The operating regulations 
for this may differ in the individual EC countries.

Regulations for compressed air tanks in Germany 

Inspection periods

The given inspeciton periods are maximum values. They 
should be verified by the risk assessment/valuation of em-
ployer of the operating company. No delays are admissible for 
this. It is only possible to shorten the period.
The product of pressure and volume depends on the inspec-
tion periods. For this, the maximum admissible pressure (PS) 
must be multiplied with the pressure tank volume (V).
Example:    
Pressure tank= 50l ;  max. zulässiger  Druck= 10 bar
50 l x 10 bar = 500                   

*The employer must communicate the relevant inspection peri-
ods to the responsible authority within 6 month after commis-
sioning the installation(par. 15 BetrSichV).
**External tests can be omitted: a) for pressure tanks accor-
ding to point 2.2 (letter a)BetrSichV, unless they are fire-hea-
ted, heated exhaust gas or electrically heated, and 
b) in the case of simple pressure tanks according to BetrSichV 
point 2.2 letter d. The deadline of the strength test may be ex-
tended to 15 years If it is shown in the external or internal test 
that the machine can be safely operated. The confirmation 
must be shown in the documentation of the risk assessment. 
Table according to BetrSichV (State: 29.03.2017).

Regulations for compressed air tanks in Austria

Pressure devices as of 0,5 bar are submitted to the „Vessel 
Law“ pressure devices monitoring directive (DGÜW-V) in Aus-
tria. 
This directive makes a differentiation between low hazard po-
tential (NGP) and high hazard potential (HGP) .
NGP: Overall compressed air product (pxV) below 3000 litres
HGP: Overall compressed air product (pxV) above 3000 litres

NGP (Low risk potential)

For the devices that fall into the NGP, the operator has no obli-
gation to inform boiler test centers. If a customer buys a device 
with NGP, he / she does NOT have to register this for the first in-
spection by a boiler testing center (TÜV Austria Services 
GmbH).

HGP (low hazard potential)

The operating company is not obligated to inform vessel in-
spection authorities for devices classified as NGP.

For devices that fall into the HGP you need a first operation test 
from a boiler testing center (TÜV Austria Services GmbH).
With the declaration of conformity and the operating instructi-
ons, the tank must be reported to the boiler testing center.

TÜV AUSTRIA SERVICES GMBH 
Lunzerstraße 89 
4030 Linz/Österreich
http://www.tuv.at
They carry out the service test. und stellen,if everything is ok, fill 
in a book.The container is then subjected to periodic inspecti-
ons (eg test level 4, minor damage: every 2 years external ex-
amination, every 6 years an internal examination and every 12 
years main examination)

CAUTION! RISK OF INJURY

-  Never direct compressed air to persons or animals.
-   Grab the end of the compressed air hose with your 

hand before opening the quick coupling in order to 
prevent the tool from flying off by pressure.

-  Allow the compressor to cool down prior to main-

tenance work.

Check

Inspection periods

Inspection organisa-
tion

Prior to commis-
sioning/ positio-
ning

PS x V </=200

Qualified person

with type exami-
nation certificate
PS x V </=1000

Qualified person

PS x V >/=200

Approved inspec-
tion agency

Exterior inspec-
tion
**

Once a year/
every 2 years
PS x V </= 1000

Qualified person

Interior inspec-
tion
**

Once every 5 
years for PS x V 
</=1000

Qualified person

*Every 5 years 
PS x V >/=1000

Approced inspec-
tion agency

Strength test**

Once every 10 
years
PS x V </=1000

Qualified person

*Once every 10 
years
PS x V >/=1000

Approved inspec-
tion agency

Check

Inspection periods

Inspection organisa-
tion

Содержание 2001230

Страница 1: ...AIRBOY 186 OF E Operating Instructions AIRBOY 186 OF E AIRBOY Mobile Compressor AIRBOY 206 OF E AIRBOY 206 OF E...

Страница 2: ...pli citly permitted Contraventions are liable to compensa tion Subject to technical modifications and error Content 1 Introduction 3 1 1 Copyright 3 1 2 Customer service 3 1 3 Limitation of liability...

Страница 3: ...one 0043 0 7752 70 929 0 Fax 0043 0 7752 70 929 99 E Mail info aircraft at Internet www aircraft at Germany St rmer Maschinen GmbH Dr Robert Pfleger Str 26 D 96103 Hallstadt Repair service Fax 0049 0...

Страница 4: ...dapt the operating instructions where necessary Operators shall clearly manage and specify the re sponsibilities for installation operation trouble shooting maintenance and cleaning Operators must mak...

Страница 5: ...her staff is not permitted to carry out this work Contact our customer service to have the work carried out 2 4 Personal protective equipment Personal protective equipment is intended to protect the h...

Страница 6: ...are submitted to the Vessel Law pressure devices monitoring directive DG W V in Aus tria This directive makes a differentiation between low hazard po tential NGP and high hazard potential HGP NGP Over...

Страница 7: ...es are reached However we recommend not to load the compressor above 50 of its capacity and not to have it run in con tinuous operation for more than 15 minutes Furthermore many accessories can be con...

Страница 8: ...ether all parts included in the scope of delivery are present Transport The compressor may only be transported with the en gine switched off and disconnected from the mains The container must not be u...

Страница 9: ...and 7 5 minutes standstill WARNING Danger There is a risk of injury to the operator and other per sons if they do not adhere to the following rules The compressor may only be operated by a trained an...

Страница 10: ...hile the compressor is operating Use the compressor only on firm level ground If it can not be avoided a possible incline must not exceed 15 NOTE The compressor is designed for interval operation For...

Страница 11: ...device by continuing to operate the connected tool until the pressure has released 7 4 Switch off Step 1 To zero the pressure after using the device continue to operate the connected tool until the p...

Страница 12: ...risks involved NOTE Observe the check intervals for pressure vessels see chapter Checking operational safety DANGER Electric shock is life threatening There is a danger of life in case of contact with...

Страница 13: ...may only be car ried out by a specialized company or by duly trained personnel Any maintenance work on electrical equipment may only be carried out by specialized electrical staff or under the supervi...

Страница 14: ...parts drawing number Position No Year of construction Quantity Required mode of dispatch mail freight sea air express Address of dispatch Spare part orders which do not include the above indi cations...

Страница 15: ...in case of service to identify necessary spare parts If necessary send a copy of the parts drawing with the marked components to your dealer Spare parts drawing AIRBOY 186 OF E Fig 7 Spare parts draw...

Страница 16: ...16 AIRBOY Version 1 07 Spare parts Spare parts drawing compressor AIRBOY 186 OF E and AIRBOY 206 OF E Fig 9 AIRBOY 186 OF E and AIRBOY 206 OF E...

Страница 17: ...s EU directives 2014 30 EU EMV Directive 2014 68 EU Pressure Equipment Directive 2014 29 EU Directive on simple pressure vessels The following harmonized standards were applied DIN EN 1012 1 2011 02 C...

Страница 18: ...www aircraft at...

Отзывы: