11�2 Choose operational mode

When 2 or more compressed air stations are connected 
to the same network then one compressed air station 
must run in main operating mode, all others must be set 
to run in auxiliary operating mode�  The factory setting is 
for main operating mode� 

In order to use more than one compressed air 
station connected to a single display panel, all 
the units must be connected to one network�

• Set the appropriate operational mode of the compressed 

air station at the display panel� 

11�3 Document acceptance test

• Check the compressed air station according to the 

final testing/handover examination and record 

• (See appropriate form in Appendix�)

11�4 Measuring dew point (optional)

Only carry out dew point measurements after approx� 4 
complete fillings of the pressure tank (approximately 16 
m

3

) have been used�

• The compressed air for the dew point measurement should 

be taken from the measuring connection point (1)�

1

11  Initial start-up

Wear ear protectors�

11�1 Switching on compressed air station

• Check that the shutoff valve (on the tank ) to the com-

pressed air network is closed�

• Rotate switch to Emergency Mode setting "0"�
• Switch on at main power switch� 

When the controller is ready, the display "Operational" 
is shown�

I

2

0

1

2

1

• If the refrigerant dryer does not automatically switch 

on, use the operating panel and switch it on from 
here�

Once the refrigerant dryer is switched on the 
dew point temperature is shown� 

After approximately 60 seconds the compressor aggre-
gate start up one after the other� 
After two to 3 minutes the refrigerant dryer displays 
a temperature between 32°F /0 °C and 39,2°F /+4 °C�
Once the cut off pressure has been reached the com-
pressor aggregates switch off one after the other�
• Check all compressed air connections and lines for 

any signs of leakages� 

• Open the shutoff valve to the compressed air network�

Содержание AirStar AS120

Страница 1: ...Installation Operating Instructions AirStar Clinical Air Compressor AS60 AS90 AS120 AS60 400 AS90 400 and AS120 400...

Страница 2: ......

Страница 3: ...8 2 Module layout 12 8 3 Set up and secure modules 12 9 Installation 13 9 1 Connect the compressed air connection to the cyclone separator 13 9 2 Connect the pressure tank to the com pressed air supp...

Страница 4: ...jury IMPORTANT Possible danger which could result in serious damage Further symbols The following symbols are used within this document and on the actual appliance Notes e g special instructions conce...

Страница 5: ...xperience Every person operating the device must be trained in its handling Installation and repair and maintenance Installation resetting alterations adding of extensions and repairs must be carried...

Страница 6: ...nd Operating Instructions AS60 400 Control module Compressor module with 2 compressor aggregates Boost transformer Connecting cables and hoses Mounting materials Installation and Operating Instruction...

Страница 7: ...ule control module lbs kg lbs kg 505 229 700 318 835 379 700 318 1055 479 700 318 Shipping Weight compressor module control module lbs kg lbs kg 605 275 850 386 940 425 850 386 11505 522 850 386 Conne...

Страница 8: ...ame of manufacturer Air Techniques Name of unit AirStar Clinical Air Compressor Models AS60 AS90 AS120 AS60 400 AS90 400 AS120 400 Control panel ConformstoUL508A theULStandardforConstruction Of Indust...

Страница 9: ...d air which is used to operate dental units simulation stations phantom places and similar The display panel is used to configure the operation of the device monitor the operating status e g fault rep...

Страница 10: ...ar 7 Control connection 8 Tank connection to air network 1 inch NPT 9 Condensate drain 10 Condensate separator drainage 11 Pressure sensor 12 Refrigerant dryer bypass valve 13 Refrigerant dryer valve...

Страница 11: ...ggregatethenrunsincontinuousoperation The alternation of aggregates no longer takes place When no air is taken from the tank the pressure in the tank increases to 145 psi 10 bar and will be maintained...

Страница 12: ...ation in purpose built rooms e g boiler room must be checked against building regulations beforehand Do not operate the units in damp or wet environments Clearly indicate that the room may only be ent...

Страница 13: ...air supply net Connect the pressure tank to the supply network using a flexible compressed air hose on site connection 1 inch NPT external thread 9 3 Connect the condensate drain outlet to the waste w...

Страница 14: ...e following information on connecting electrical lines is based on US and Canada standards Always observe the relevant national standards and local rules and regulations Diameter of the connections Th...

Страница 15: ...ave been used The compressed air for the dew point measurement should be taken from the measuring connection point 1 1 11 Initial start up Wear ear protectors 11 1 Switching on compressed air station...

Страница 16: ...e switch to Emergency Mode setting 2 The compressor aggregate then runs in continuous operation The red LED Fault shows 0 1 2 13 Decoupling a single compressor aggregate Where a single compressor aggr...

Страница 17: ...tighten screws Check the compressed air connections for any signs of leakages if necessary seal Check the operating hours of the compressor aggregates If there are large differences in the compressor...

Страница 18: ...n relief valve Change the controller at the display panel to manual Switch on the individual compressors aggregate manu ally using the display panel After approximately 5 seconds the non return relief...

Страница 19: ...eak Check units and air supply for signs of leakages if necessary seal leaks Display Pressure sensor 1 defect Units do not function red LED Fault lit Connection between pressure sensor and controller...

Страница 20: ...sary replace module 16 2 Further messages at display panel The following messages give information but do not indicate a fault or downtime of the units Message Probable cause Solution Bacterial filter...

Страница 21: ...safety of the system according to current national and local code has been checked and confirmed Training in the operation and handling of the unit s has been carried out See back page The delivery r...

Страница 22: ...Inc Page 22 Trained Personnel Log Name Signature Date Name Signature Date Name Signature Date Name Signature Date Name Signature Date Name Signature Date Name Signature Date Name Signature Date Form i...

Страница 23: ...it will not be applied to product returns that exhibit damage due to shipping misuse careless handling or repairs by unauthorized personnel Credit or partial credit will not be issued until products p...

Страница 24: ...er Evacuation System Cleaner Imaging Accessories Chemistry Processor Accessories For over 50 years Air Techniques has been a leading innovator and manufacturer of dental products Our priority is ensur...

Отзывы: