![AIC N 100 WH Скачать руководство пользователя страница 2](http://html1.mh-extra.com/html/aic/n-100-wh/n-100-wh_installation-and-maintenance-manual_2870754002.webp)
G-2
Z-038791_EN • Rev A
T
able
of
C
onTenTs
................................G-4
Liabilities of the Manufacturer, the Installer
and the End user ..............................................G-4
About this Manual ............................................G-5
Safety Instructions ...........................................G-6
Package Contents ...........................................G-7
Boiler Marking ..................................................G-7
...............................G-8
NESTA CHROME 60-80-100-120 ....................G-8
Control Panel and Main Functions .................G-10
Symbols and Messages on the Control Panel ...G-11
Dimensions and Clearances ...........................G-12
Performance and Efficiency Data ...................G-14
ERP Data ........................................................G-14
Combustion and Gas Data .............................G-15
Electrical Data ................................................G-15
Hydraulic Data ................................................G-16
Pressure Drop Curve ......................................G-16
Flow Rate .......................................................G-16
Safety Instructions for the User ......................U-17
Periodic checks .............................................U-18
Starting the Appliance ....................................U-19
Stopping the Appliance ..................................U-19
What to Do if... ...............................................U-19
Basic Settings ................................................U-20
Structure of Menus for the End User .............U-23
.............................. I-25
Safety Instructions for the Installation ............. I-25
Handling the Product ...................................... I-26
Unpacking the Product ................................... I-26
Installing and Preparing the Boiler .................. I-26
Installing the Wall Bracket ............................... I-26
Installing and Removing the Condensate Trap .. I-27
Removing and Installing the Access Panels ... I-28
Requirements for the Hydraulic Connections .... I-29
Water Quality Requirements to Prevent
Scaling and Corrosion ..................................... I-30
Typical Hydraulic Connections - Heating Circuit .. I-31
Hydraulic Connections - Cascaded boilers,
with External Domestic Hot Water Tank and
Plate Heat Exchanger ...................................... I-32
Hydraulic Connections - Cascaded boilers,
with External Domestic Hot Water Tank and
Low Loss Header ............................................ I-33
Safety Instructions for the Gas Connection .... I-34
Safety Instructions for the Chimney Connections . I-35
General Instructions for the Installation of
AIC-approved Chimney Components ............. I-36
Chimney Connection ....................................... I-37
AIC-Approved Chimney Components ............. I-40
Engineering the Chimney System ................... I-41
Accessories ..................................................... I-41
Calculation of the Chimney Length ................. I-41
Safety Instructions for the Electrical Connections . I-43
Cables ............................................................. I-43
Routing the Cables .......................................... I-43
Accessing the High and Low Voltage Terminal
Strips and Electronic Board ............................ I-44
Wiring Diagram ................................................ I-45
........................................ I-46
Safety Instructions Before Start-up ................. I-46
Filling the System ............................................ I-46
Start-up and Combustion Adjustments .......... I-47
........................................... I-48
Safety Instructions for Maintenance ............... I-48
Maintenance Requirements ............................ I-49
Shutting Down for Maintenance ...................... I-50
Draining the Boiler ........................................... I-50
Restarting after Maintenance .......................... I-50
Removing and Installing the Ignition and
Ionisation Electrodes ....................................... I-51
Removing and Installing the Fan and Air-Gas
Mixer Assembly ............................................... I-52
Removing and Installing the Burner ................ I-54
Checking and Cleaning the Combustion
Chamber .......................................................... I-56
Checking the Flue Pressure Switch operation I-56
Optional Modules ............................................ I-57
Boilers in a Cascade System .......................... I-58
Boiler Settings for the Installer ........................ I-60
Structure of Menus for the Installer ................. I-60
Error Codes and Solutions .............................. I-64
Maintenance Messages .................................. I-69
Troubleshooting ............................................... I-70
Installation Checklist ....................................... I-72
Combustion Parameters - Log Sheet.............. I-75
Содержание N 100 WH
Страница 55: ...X6 X6 3 4 5 6 2 1 Fig 21 Removing and Installing the Burner I 55 Z 038791_EN Rev A Maintenance ...
Страница 78: ...I 78 Z 038791_EN Rev A NOTES ...
Страница 79: ...I 79 Z 038791_EN Rev A NOTES ...
Страница 80: ...www myaic eu AIC Europe B V Graafschap Hornelaan 163A NL 6001 AC Weert The Netherlands ...