S150/S151/S152/Z152
8-5
Maintenance
8
8.2.2.3 Front axle
(1) Remove the plugs from the axle arches (8-4/arrow)
and/or (8-5/arrow).
NOTE
-
The oil level must reach the plug bore.
-
Collect any escaping oil.
(2) Re-insert the plug.
8.2.3
Check oil fill-level transfer gearbox
» Slow-runner 20 km/h and 25 km/h «
(1) Remove plug (8-6/arrow).
NOTE
-
The oil level must reach the plug bore.
-
Collect any escaping oil.
(2) Re-insert plug.
Fig. 8-4
Fig. 8-6
Fig. 8-5
i
i
Содержание AS 150
Страница 7: ...Safety regulations ...
Страница 19: ...Signs ...
Страница 22: ...Anti TheftProtection ...
Страница 25: ...Description ...
Страница 34: ...Operations ...
Страница 46: ...Attachments ...
Страница 54: ...Rescue Towing Lashing Crane Lifting ...
Страница 61: ...Maintenance ...
Страница 80: ...Troubleshooting ...
Страница 83: ...Wiring and Hydraulics ...
Страница 98: ...Technical Data Equipment ...
Страница 103: ...Technical Data Attachments ...
Страница 108: ...S150 S151 S152 Z152 12 6 12 Technical Data Attachments 12 3 Front end Loader Measurements according to ISO 7131 35 ...
Страница 110: ...S150 S151 S152 Z152 12 8 12 Technical Data Attachments 12 4 Lifting Hook Dimensions according to ISO 7131 35 ...
Страница 112: ...Optional Extras Changes ...