
1-25
Installing the Test Set
Step 7. Power up the System
Gain Adjustment
.
c.
In Select Specials, select
None
.
d.
No connections to the test ports are required.
e.
Click
Begin Adj
. The adjustment takes about a minute to complete.
The advanced screen is for factory personnel only.
NOTE
To start the PNA in 4-port mode (Step 7), Option 550 must already be
enabled on the PNA. See PNA Help to learn more about Option 550.
In addition, the PNA must have firmware version A.06.03.05 or later.
To check both of these on the PNA, click Help, then About Network
Analyzer.
7.
When the PNA application has completely powered up, and the default trace is
present, then:
a.
Click
System
, point to
Configure
, then click
Multiport Capability
b.
On the Multiport Restart dialog, select Testset:
N44xx
, then click
Restart as a
Multiport PNA with this testset.
c.
Click OK
The PNA should shut down and restart as a 4-port PNA. To learn more about the
Option 550 capabilities and limitations, see PNA Help. In the Help file index, type
“Option 550”.
8.
If you intend to always use the default port mapping, attach the “Port 3” label
(included with accessories) over the “Port 2” label on the PNA front panel. This will
help to eliminate confusion when referring to the system “logical” ports. To learn
more about port mapping, see the PNA Help, option 550 topic.
Содержание N4419B
Страница 6: ...Contents vi Service Guide N5242 90001 Contents...
Страница 7: ...1 1 1 Installing the Test Set...
Страница 33: ...2 1 2 Specifications and Characteristics...
Страница 37: ...3 1 3 Safety and Regulatory Information...
Страница 44: ...3 8 Safety and Regulatory Information Regulatory Information...