
1-18
Installing the Test Set
Step 5. Make the Interconnections between the Test Set and the PNA
Damage to the interconnect cable can result from improper connection of
the cable.
TIP
If the test set and the PNA are rack mounted, the screws securing the rack
mount flanges to the instrument rack may be loosened slightly to allow for
minor repositioning of the instruments. Don't forget to retighten the screws
when you are done.
3.
Continue with
“Step 6. Set Up the General Purpose Interface Bus (GPIB)” on
.
Содержание N4419B
Страница 6: ...Contents vi Service Guide N5242 90001 Contents...
Страница 7: ...1 1 1 Installing the Test Set...
Страница 33: ...2 1 2 Specifications and Characteristics...
Страница 37: ...3 1 3 Safety and Regulatory Information...
Страница 44: ...3 8 Safety and Regulatory Information Regulatory Information...