Installing the Test Set

Step 4. Install the System on a Bench Top or in an Equipment Rack

To Install in an Equipment Rack

You may install the system in an equipment rack in one of following two ways:

When you install the test set in an equipment rack, you will install rails in the rack to 
support the weight of the test set, attach the handles and the rack mount flanges to the 
test set, and secure the test set to the equipment rack.

1.

Ensure that the front handle kit, the rack mount flange kit, and the rack mount rail 
set are complete.

NOTE

If any items are damaged or missing from a kit, contact us to order a 

replacement kit. Items within these kits are not individually available.

2.

Install the rails into the equipment rack using the instructions provided. Consider 
that the test set is two rack units high (3.5 inches). Mount the test set immediately 
below the PNA.

NOTE

For the N4420B or N4421B test set, connect the network analyzer to the 
test set before placing in the rack as a single unit on one set of rails.

3.

Attach the cabinet mount flanges and the handles to the sides of the front panel, 

Removing Feet from PNA

Leaving Feet attached to PNA

1. Install one set of rails into the 

equipment rack

2. Remove feet from Test Set and PNA
3. Attach mount flanges and the handles to 

Test Set

4. Attach mount flanges and the handles to 

PNA

5. Insert test set on rails in equipment rack 

and screw to rack

6. Place PNA on top of test set and screw 

PNA into rack

7. Bend Semi-rigid interconnect cables to 

fit between the test set connector and the 
PNA connector

8. Connect semirigid between test set and 

PNA

1. Install one set of rails into the 

equipment rack

2. Remove feet from Test Set only
3. Attach mount flanges and the handles to 

Test Set

4. Attach mount flanges and the handles to 

PNA

5. Insert test set on rails in equipment rack 

and screw to rack

6. Place PNA on top of test set
7. Connect semirigid between test set and 

PNA

Handle Kit Contents

Flange Kit Contents

• 4 Screws
• 2 Side Trim Strip
• 2  Handles
• Installation Instructions

• 4 Screws (Long)
• 4 Screws with Washers
• 4 Nuts with Metal Clips
• 2  Flanges
• Installation Instructions

Содержание N4419B

Страница 1: ...Option 550 Note If this Test Set is to be used with PLTS software please DO NOT USE THIS MANUAL Use the PLTS Installation Guide N1930 90005 that was shipped with PLTS and is also available at www Agil...

Страница 2: ...NT THAT CONFLICT WITH THESE TERMS THE WARRANTY TERMS IN THE SEPARATE AGREEMENT WILL CONTROL DFARS Restricted Rights Notice If software is for use in the performance of a U S Government prime contract...

Страница 3: ...ion pertaining to this product is located in Chapter 3 Safety and Regulatory Information Safety Notes The following safety notes are used throughout this manual Familiarize yourself with each of the n...

Страница 4: ...pabilities and limitations of Option 550 Click Help on the PNA menu bar or press the Help key on the PNA front panel This Installation Guide helps you to connect the Test Set to the PNA The N4419B N44...

Страница 5: ...a Bench Top or in an Equipment Rack 1 10 Step 5 Make the Interconnections between the Test Set and the PNA 1 16 Step 6 Set Up the General Purpose Interface Bus GPIB 1 22 Step 7 Power up the System 1 2...

Страница 6: ...Contents vi Service Guide N5242 90001 Contents...

Страница 7: ...1 1 1 Installing the Test Set...

Страница 8: ...Up the PNA 3 Attach the Test Set to the Network Analyzer N4420B or N4421B Test Set Only 4 Install the Test Set on a Bench Top or in an Equipment Rack 5 Make the Interconnections between the Test Set...

Страница 9: ...system from the containers in which it was shipped WARNING The test set hardware may be heavy Use proper lifting techniques 2 Carefully inspect the test set hardware to make sure that it was not damag...

Страница 10: ...3 Varies by Test Set Model and Option Semirigid interconnect cables refer to Step 5 Make the Interconnections between the Test Set and the PNA 4 Unique to country AC Power Cord for the test set 5 AD0...

Страница 11: ...t 4 If you ordered any of the following options check the parts Option 1CP is shipped in a separate container Option Number Item Number Part Description 1CP 1A 1B Rack mount flange kit For use with ha...

Страница 12: ...f you are installing your PNA in an equipment rack be sure to leave at least 2 rack units of space below the analyzer to install the test set NOTE For the N4420B or N4421A B test set connect the PNA t...

Страница 13: ...ttached to the N4420B and N4421B test sets using lock links at the front and locking feet at the rear Preparing the PNA 1 Remove the four feet from the bottom of the PNA 2 Remove the screws from the t...

Страница 14: ...0515 1619 from the rear panel on the test set 5 Install the top left and right rear locking feet from the kit 5063 9253 using screws 0515 1244 6 Remove the trim strip from the top of the front frame 7...

Страница 15: ...g the PNA to the Test Set 8 Place the PNA on top of the test set ensuring that the front frame of the PNA is positioned slightly forward of the lock links that are attached to the the test set Then sl...

Страница 16: ...t 9 Secure the PNA lower locking feet to the test set s upper locking feet using the spring loaded screws NOTE If the screw holes are not aligned loosen the screws that secure the feet to both the PNA...

Страница 17: ...ntilation Requirements When installing the product in a cabinet the convection into and out of the product must not be restricted The ambient temperature outside the cabinet must be less than the maxi...

Страница 18: ...he bench top Make sure that there is at least four inches of clearance on the sides and back of the system for adequate ventilation The front panel test cables are shown only as a reminder to make sur...

Страница 19: ...placing in the rack as a single unit on one set of rails 3 Attach the cabinet mount flanges and the handles to the sides of the front panel Removing Feet from PNA Leaving Feet attached to PNA 1 Instal...

Страница 20: ...Rack using two long screws per side Attach the flanges to the outside of the handles WARNING If an instrument handle is damaged you should replace it immediately Damaged handles can break while you ar...

Страница 21: ...sing the directions imprinted on the feet 5 Ensure there is adequate clearance between the system cabinet and the sides and back of the test system for adequate ventilation CAUTION Consider the ventil...

Страница 22: ...set and slide it onto the rails that you installed earlier from the front of the equipment rack Secure the test set to the equipment rack using the screws with washers and metal clipped nuts provided...

Страница 23: ...rs to 8 inch pounds NOTE The Reference channel path through the test set is used to compensate for electrically long DUTs This also results in added loss in the Reference channel and higher trace nois...

Страница 24: ...connection of the cable TIP If the test set and the PNA are rack mounted the screws securing the rack mount flanges to the instrument rack may be loosened slightly to allow for minor repositioning of...

Страница 25: ...ween the Test Set and the PNA N4420B Test Set with E8363B and N4421B Test Set with E8364B CAUTION Damage to the interconnect cable can result from improper orientation of the cable Refer to page 1 16...

Страница 26: ...PNA Help system Call Out Sequence Cable Part Number From Network Analyzer To Test Set 1 Z5623 20215 REF 1 SOURCE OUT REF 1 R1 OUT 2 Z5623 20215 REF 1 RCVR R1 IN REF 1 RCVR R1 IN 3 Z5623 20215 REF 2 R...

Страница 27: ...ns between the Test Set and the PNA N4419B Test Set with E8362B or N5230A Option 225 CAUTION Damage to the interconnect cable can result from improper orientation of the cable Refer to page 1 16 for d...

Страница 28: ...NOTE Cables are orderable only as cable set AD00756 Call Out Sequence Cable Part Number From Network Analyzer To Test Set 1 AD00756 1 REF 1 SOURCE OUT REF 1 SOURCE OUT 2 AD00756 1 REF 1 RCVR R1 IN RE...

Страница 29: ...numbered 0 to 30 However there may be the occasion that you need to change the GPIB address for test equipment GPIB addresses are set either using rear panel switches or using the equipment firmware R...

Страница 30: ...ent NOTE Perform Step 6 ONLY when both of the following are true Otherwise skip to Step 7 Using the Reference channel paths through the test set See page 1 16 for more information Using a PNA model E8...

Страница 31: ...When the PNA application has completely powered up and the default trace is present then a Click System point to Configure then click Multiport Capability b On the Multiport Restart dialog select Tes...

Страница 32: ...PNA 2 Set the stop frequency on the PNA channel to the maximum frequency of either the test set or the PNA which ever is lower This is probably the default setting 3 On the PNA click Trace then Delete...

Страница 33: ...2 1 2 Specifications and Characteristics...

Страница 34: ...erformance Specifications include guard bands to account for the expected statistical performance distribution measurement uncertainties and changes in performance due to environmental conditions Char...

Страница 35: ...tions and physical characteristics are displayed on the following pages Frequency Range Table 2 1Test Set Frequency Range and PNA Model Test Set Model Frequency Range Recommended PNA Model N4419B 10 M...

Страница 36: ...est sets are listed below Weight and Dimensions Table 2 2Test Set Weight and Dimensions Model Number Weight Dimensions Height A Width B Depth C N4419B 9 0 kilograms 19 9 pounds 3 0 in 7 62 cm 16 75 in...

Страница 37: ...3 1 3 Safety and Regulatory Information...

Страница 38: ...al layer test system CAUTION Caution denotes a hazard It calls attention to a procedure that if not correctly performed or adhered to would result in damage to or destruction of the instrument Do not...

Страница 39: ...his symbol indicates that the power line switch is in the OFF position This symbol is used to identify a terminal which is internally connected to the product frame or chassis The CE mark is a registe...

Страница 40: ...struction documentation contains information and warnings which must be followed by the user to ensure safe operation and to maintain the instrument in a safe condition Safety Earth Ground WARNING Thi...

Страница 41: ...pply voltage is in the specified range Servicing WARNING No operator serviceable parts inside Refer servicing to qualified personnel To prevent electrical shock do not remove covers WARNING These serv...

Страница 42: ...could be impaired This product must be used in a normal condition in which all means for protection are intact only CAUTION This product is designed for use in Installation Category II and Pollution...

Страница 43: ...ents This ISM device complies with Canadian ICES 001 Cet appareil ISM est conforme a la norme NMB du Canada Compliance with German Noise Requirements This is to declare that this instrument is in conf...

Страница 44: ...3 8 Safety and Regulatory Information Regulatory Information...

Отзывы: