![Agilent Technologies HP 5890 II Plus Series Скачать руководство пользователя страница 29](http://html1.mh-extra.com/html/agilent-technologies/hp-5890-ii-plus-series/hp-5890-ii-plus-series_manual_2868131029.webp)
Installation
Connecting supply gases
28
Scre
w
Plat
e
Carrier gas inlet fit-
ting
Flow restrictor
7. Replace the carrier gas connector and turn on the gas to a pressure of
50 to 60 psi. Leak test your work.
Gas supply tube connections
Assemble the fittings as shown. Push the tubing into the fitting as far as
it will go, then tighten the fitting by hand (no wrench). Use a wrench to
tighten further (3/4•turnfor 1/8•inchtubing, 1•1/4•turnfor 1/4•inch
tubing).
Содержание HP 5890 II Plus Series
Страница 1: ...Chemical Analysis Group 5890 Gas Chromatograph 5890 Series II Site Prep Info Document A15282 ...
Страница 2: ...Site Prep Installation Manual HP 5890 Series II and HP 5890 Series II Plus ...
Страница 6: ...1 Site Preparation ...
Страница 19: ...This page intentionally left blank ...
Страница 20: ...2 Installation ...