![Agilent Technologies HP 5890 II Plus Series Скачать руководство пользователя страница 18](http://html1.mh-extra.com/html/agilent-technologies/hp-5890-ii-plus-series/hp-5890-ii-plus-series_manual_2868131018.webp)
Site Preparation
Assembling the gas plumbing
17
Making swage-type connections
Assemble fitting,
bottom tubing
Hand-tighten,
then wrench-tighten
Swage-Type Fittings
Assemble the fittings as shown. Push the tubing into the fitting as far as
it will go, then tighten the fitting by hand (no wrench). Use a wrench to
tighten further (3/4•turnfor 1/8•inchtubing, 1•1/4•turnfor 1/4•inch
tubing).
Содержание HP 5890 II Plus Series
Страница 1: ...Chemical Analysis Group 5890 Gas Chromatograph 5890 Series II Site Prep Info Document A15282 ...
Страница 2: ...Site Prep Installation Manual HP 5890 Series II and HP 5890 Series II Plus ...
Страница 6: ...1 Site Preparation ...
Страница 19: ...This page intentionally left blank ...
Страница 20: ...2 Installation ...