![Agilent Technologies HP 5890 II Plus Series Скачать руководство пользователя страница 25](http://html1.mh-extra.com/html/agilent-technologies/hp-5890-ii-plus-series/hp-5890-ii-plus-series_manual_2868131025.webp)
Installation
Connecting supply gases
24
Auxiliary flow panels
For auxiliary flow panel(s), follow instructions included with the panel to
connect supply tubing between each pressure regulator and the
appropriate mass flow controller or flow manifold block, and to connect
gas supplies to the pressure regulators.
If
no
supply gas is to be connected
directly
to an inlet mass flow
controller or detector flow manifold block, proceed to Setting initial
supply pressures and leak testing in this section.
Auxiliary Flow Panel
After locating the appropriate panel, and before connecting the gas
supply tubes and fittings:
1. Make sure gas supplies to be connected are turned off at their
sources.
2. Remove the left side panel by removing two screws along its bottom
edge, then slide the panel toward the rear of the instrument and lift.
Содержание HP 5890 II Plus Series
Страница 1: ...Chemical Analysis Group 5890 Gas Chromatograph 5890 Series II Site Prep Info Document A15282 ...
Страница 2: ...Site Prep Installation Manual HP 5890 Series II and HP 5890 Series II Plus ...
Страница 6: ...1 Site Preparation ...
Страница 19: ...This page intentionally left blank ...
Страница 20: ...2 Installation ...