Installation Note E8361-90003

Step 6. Install the Attenuators and New Cables

Refer to 

Figure 8

. The new parts referenced in this step are listed in 

Table 1 on page 4

.

1. Attach one step attenuator to each bracket, using two M3.0 x 8 screws for each.

Be careful to position the step attenuators so that the necessary cables can be attached. 

The end of the step attenuator with the ribbon cable connector must face toward the 

outside of the analyzer.

2. Install the following cables in the order listed. Some of these cables are new and provided 

in the kit and some of them were removed in a previous step.
• Ribbon cable 

{

8121-0819 A43 ch A attenuator to A16 motherboard (

P1 RCVR ATT

)

• Ribbon cable 

|

8121-0819 A44 ch B attenuator to A16 motherboard (

P2 RCVR ATT

)

• W71 E8361-20020 REFERENCE 2 RCVR R2 IN to A29 channel R2 mixer
• W68 E8361-20018 A26 test port 2 coupler to PORT 2 CPLR ARM
• W50 E8361-20029 PORT 2 RCVR B IN to A44 channel B step attenuator
• W82 E8361-20026 A37 step attenuator to PORT 2 SOURCE OUT
• W84 E8361-20028 PORT 2 CPLR THRU to A39 bias tee
• W66 E8361-20016 A24 SOMA 70 to REFERENCE 2 SOURCE OUT
• W70 E8361-20049 REFERENCE 1 RCVR R1 IN to A28 channel R1 mixer
• W49 E8361-20032 PORT 1 RCVR A IN to A43 channel A step attenuator
• W67 E8361-20018 A25 test port 1 coupler to PORT 1 CPLR ARM
• W83 E8361-20034 PORT 1 CPLR THRU to A38 bias tee
• W81 E8361-20035 A36 step attenuator to PORT 1 SOURCE OUT
• W65 E8361-20015 A23 SOMA 70 to REFERENCE 1 SOURCE OUT
• W47 E8361-20064 A43 channel A step attenuator to A27 channel A mixer
• W48 E8361-20025 A44 channel B step attenuator to A30 channel B mixer

Содержание E8361AU-016

Страница 1: ...nted in USA June 2008 Supersedes print date May 2008 Agilent Technologies Inc 2004 2005 2007 2008 Installation Note Receiver Attenuators Upgrade Kit To Add Option 016 Upgrade Kit Order Numbers E8361AU 016 and E8361CU 016 For E8361A C PNA Series Microwave Network Analyzers ...

Страница 2: ...m as defined in FAR 2 101 a or as Restricted computer software as defined in FAR 52 227 19 June 1987 or any equivalent agency regulation or contract clause Use duplication or disclosure of Software is subject to Agilent Technologies standard commercial license terms and non DOD Departments and Agencies of the U S Government will receive no greater than Restricted Rights as defined in FAR 52 227 19...

Страница 3: ...ut Installing the Upgrade Kit IMPORTANT Option 016 can only be installed on analyzers with the option combinations listed below as Products affected If your analyzer does not have the proper options as listed below it will be necessary to install those options BEFORE installing this option Option 016 Description of Option 016 Receiver Attenuators This option adds a 50 dB step attenuator in the cha...

Страница 4: ...w M3 0 x 8 for attaching attenuators 4 0515 0372 A43 A44 50 dB step attenuator 2 84905 60001 Ribbon cable for A43 and A44 step attenuators 2 8121 0819 W20 RF cable A8 synthesizer J106 to A17 LOMA 12 J2 1 E8361 20046 W21 RF cable A8 synthesizer J101 to A17 LOMA 12 J3 1 E8361 20045 W47 RF cable A43 channel A step attenuator to A27 channel A mixer 1 E8361 20064 W48 RF cable A44 channel B step attenua...

Страница 5: ...thin the network analyzer Static electricity can build up on your body and can easily damage sensitive internal circuit elements when discharged Static discharges too small to be felt can cause permanent damage To prevent damage to the instrument always wear a grounded wrist strap having a 1 MΩresistor in series with it when handling components and assemblies always use a grounded conductive table...

Страница 6: ...e the Front Panel Assembly Step 4 Raise the Receiver Deck Step 5 Remove the Existing Cables Step 6 Install the Attenuators and New Cables Step 7 Lower and Fasten the Receiver Deck Step 8 Reinstall the Front Panel Assembly and Front Panel Jumpers Step 9 Reinstall the Outer Cover Step 10 Enable Option 016 Step 11 Perform Post Upgrade Adjustments and Calibration ...

Страница 7: ...2 x 4 ft conductive table mat and 15 ft grounding wire 1 9300 0797 ESD heel strap for use with conductive floors 1 9300 1308 Description Agilent Part Number Power meter E4418B E4419B Power sensor Type N 100 kHz 4 2 GHz 8482A Power sensor 2 4 mm 4 2 GHz 50 GHz 8487A Power sensor V Band 50 GHz 67 GHz a a This sensor and adapter must be calibrated together by the Agilent factory The data supplied are...

Страница 8: ...lready been disconnected 2 With a T 20 TORX driver remove the four rear panel feet item by removing the center screws item 3 Slide the four bottom feet item off the cover 4 With a T 20 TORX driver remove the strap handles item by loosening the screws item on both ends until the handle is free of the analyzer 5 Slide the cover off of the frame Figure 2 Outer Cover Removal NOTE The figure above show...

Страница 9: ... A8J101 If the part numbers are E8361 20045 and E8361 20046 respectively then they do not need to be replaced Proceed to step 5 on the next page If the part numbers ARE NOT E8361 20045 and E8361 20046 respectively they need to be replaced Continue at step 4 on the next page Figure 3 Inner Cover Removal to Verify W20 and W21 Part Numbers NOTE The figure above shows the E8361A front panel and floppy...

Страница 10: ...ide connections and two bottom side connections Remove the cables from the analyzer d Position the new cables in the analyzer and connect them as follows W20 A8J106 to A17J2 W21 A8J101 to A17J3 Tighten the connectors to 10 in lbs e Reinstall the cable hold down wire item Figure 4 Replacing Cables W20 and W21 5 Replace the inner cover by reinstalling the 11 attachment screws item ...

Страница 11: ...ont panel from the analyzer lift and support the front of the analyzer chassis 3 Slide the front panel over the test port connectors 4 Disconnect the front panel interface ribbon cable item from the A3 front panel interface board The front panel is now free from the analyzer Figure 5 Front Panel Assembly Removal NOTE The figure above shows the E8361A front panel and floppy disk drive The E8361C fr...

Страница 12: ...the four screws item that secure the receiver deck 3 Pull the latch pin item towards the opposite side of the analyzer to release the receiver deck 4 Lift the receiver deck to partially raise it then release the latch pin item Lift the receiver deck to its fully raised position and ensure that the latch pin latches in the raised position Figure 6 Receiver Deck Raising ...

Страница 13: ... W82 E8361 20026 A37 step attenuator to PORT 2 SOURCE OUT W68 E8361 20018 A26 test port 2 coupler to PORT 2 CPLR ARM W72 E8361 20048 PORT 2 RCVR B IN to A30 channel B mixer W65 E8361 20015 A23 SOMA 70 to REFERENCE 1 SOURCE OUT W70 E8361 20049 REFERENCE 1 RCVR R1 IN to A28 channel R1 mixer W81 E8361 20035 A36 step attenuator to PORT 1 SOURCE OUT W83 E8361 20034 PORT 1 CPLR THRU to A38 bias tee W67 ...

Страница 14: ... 0819 A44 ch B attenuator to A16 motherboard P2 RCVR ATT W71 E8361 20020 REFERENCE 2 RCVR R2 IN to A29 channel R2 mixer W68 E8361 20018 A26 test port 2 coupler to PORT 2 CPLR ARM W50 E8361 20029 PORT 2 RCVR B IN to A44 channel B step attenuator W82 E8361 20026 A37 step attenuator to PORT 2 SOURCE OUT W84 E8361 20028 PORT 2 CPLR THRU to A39 bias tee W66 E8361 20016 A24 SOMA 70 to REFERENCE 2 SOURCE...

Страница 15: ...Installation Note E8361 90003 15 Figure 8 Attenuators and New Cables Installation ...

Страница 16: ...nalyzer to release the receiver deck 2 Lift the receiver deck to partially lower it then release the latch pin item Lower the receiver deck to its fully lowered position and ensure that the latch pin latches in the lowered position 3 With a T 10 TORX driver install the four screws item to secure the receiver deck Figure 9 Receiver Deck Lowering ...

Страница 17: ...tors being careful to align the power switch and floppy disk drive to their corresponding front panel cutouts Ensure that the ribbon cable is located below the fan to prevent it from being damaged by the fan blades 5 With a T 10 TORX driver install the eight screws item in the sides of the frame 6 Install the six semirigid jumpers item on the front panel and tighten to 10 in lbs Figure 10 Front Pa...

Страница 18: ...he cover over the analyzer frame 2 With a T 20 TORX driver install the four rear panel feet item by installing the center screws item 3 Slide the four bottom feet item into position on the cover 4 With a T 20 TORX driver install the strap handles item by installing the screws item on both ends of the handle Figure 11 Outer Cover Reinstallation NOTE The figure above shows the E8361A front panel and...

Страница 19: ...en click Option Enable 2 In the Select Desired Option list click 016 Receiver Attenuators 3 Click Enable 4 Click Yes in answer to the displayed question in the Restart Analyzer box 5 When the installation is complete click Exit Verify that Option 016 is Enabled 1 On the analyzer s Help menu click About Network Analyzer 2 Verify that 016 is listed after Options in the display 3 Click OK If Option 0...

Страница 20: ...ustments can be found at Test Equipment Required for Post Upgrade Adjustments on page 7 Calibration The analyzer should now operate and phase lock over its entire frequency range If you experience difficulty with the basic functioning of the analyzer contact Agilent Refer to Contacting Agilent on page 3 Although the analyzer functions its performance relative to its specifications has not been ver...

Отзывы: